Chronological markers in fluvial sediments can provide useful information on geomorphic response to historic catchment disturbance, and help explain historic channel morphodynamics. We concentrate on the River Nent catchment in Northern England, which was heavily impacted by lead and zinc mining in the 18th and 19th centuries. We date a 2 m deep profile of fine (<2mm) floodplain sediments using ore extraction records, covering the period 1845 to 1913, based on a significant correlation between zinc concentrations and zinc-ore extraction (r = 0.78, n = 27; p < 0.01). These dates were constrained with a basal OSL date of 2.7 ± 0.3 ka (Agemin to Agemean 1.4–3.0 ka) and existing lichenometric dates for surface gravels. Earliest lead contaminate...