Incrementally launching technique is today very competitive for the construction of continuous concrete bridges. During construction the static scheme of these bridges varies continuously, with the advance of the deck above piers, producing temporary stresses rather different from those occurring in service. An approach to analyse construction phases of curved incrementally launched bridges is presented for concrete single box girder, using the Transfer Matrix Method. A procedure based on this method, already developed for straight launched bridges, has been extended to curved beams, allowing engineers to estimate the effects of horizontal curvature during the entire launching process. This procedure allows engineers to carry out parametric...
Composite steel and concrete curved bridges are often used in highways, particularly for motorway in...
textDue to advances in fabrication technology, the use of steel trapezoidal box girders for curved ...
textThe majority of a bridge designer’s time is spent ensuring strength and serviceability limit sta...
Incrementally launching technique is today very competitive for the construction of continuous concr...
The structural behaviour of incrementally launched bridges in the construction stages depends on dif...
This research paper summarizes literature review of structural analysis methods for horizontally cur...
This report presents the background and details of a numerical procedure developed specifically for ...
Incremental launching is a common and convenient methodology to build continuous girder bridges on s...
Box girders are generally used as main girders of horizontally curved bridges, because the torsional...
The accurate design and analysis of prestressed concrete (PC) bridges during their service life are ...
In the present thesis, a numerical technique is introduced and a computer program is developed for t...
Analysis of RCC box girder bridge is carried out for three different box girder sections, i.e. singl...
Horizontally curved concrete deck on multiple steel box girder bridges is a structurally efficient, ...
There are different construction methods practiced in the bridge industry to erect bridge super stru...
In this paper, eight noded iso-parametric curved quadratic shell elements are used for Finite Elemen...
Composite steel and concrete curved bridges are often used in highways, particularly for motorway in...
textDue to advances in fabrication technology, the use of steel trapezoidal box girders for curved ...
textThe majority of a bridge designer’s time is spent ensuring strength and serviceability limit sta...
Incrementally launching technique is today very competitive for the construction of continuous concr...
The structural behaviour of incrementally launched bridges in the construction stages depends on dif...
This research paper summarizes literature review of structural analysis methods for horizontally cur...
This report presents the background and details of a numerical procedure developed specifically for ...
Incremental launching is a common and convenient methodology to build continuous girder bridges on s...
Box girders are generally used as main girders of horizontally curved bridges, because the torsional...
The accurate design and analysis of prestressed concrete (PC) bridges during their service life are ...
In the present thesis, a numerical technique is introduced and a computer program is developed for t...
Analysis of RCC box girder bridge is carried out for three different box girder sections, i.e. singl...
Horizontally curved concrete deck on multiple steel box girder bridges is a structurally efficient, ...
There are different construction methods practiced in the bridge industry to erect bridge super stru...
In this paper, eight noded iso-parametric curved quadratic shell elements are used for Finite Elemen...
Composite steel and concrete curved bridges are often used in highways, particularly for motorway in...
textDue to advances in fabrication technology, the use of steel trapezoidal box girders for curved ...
textThe majority of a bridge designer’s time is spent ensuring strength and serviceability limit sta...