Production programming consists of assigning, sequencing and timing tasks leading to the acquisition of physical assets in productive resources. Normally, we talk about "jobs" to be sequenced in "machines" so that the result of the production programming is shown in the form of a Gantt chart where each job is divided into as many tasks as necessary and each task is executed in the machines of the factory as technologically necessary. In the productive reality several machines are observed in each stage of the production process, which suggests a problem of hybrid flow workshop type (HFS). However, in some companies a machine of each stage is joined by conveyor belts. All these machines would behave like a single virtual machine since...
This paper focuses on characterization of scheduling in systems with one or multiple machines. There...
Abstract: The production line of an enterprise with a flow method of organizing production...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
http://sic.ici.ro/sic2010_3/art04.phpInternational audienceThis paper considers balancing machining ...
In this paper we examine the various effects that workstations and rework loops with identical paral...
In this paper, we deal with the problem of optimally assigning and sequencing the operations of a se...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
This paper demonstrates the importance of choosing the correct statistical distributions for breakdo...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
In a mass production environment where resources such machines are shared, a balanced and scheduled ...
71 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1997.The second problem requires jo...
The paper addresses the flow control problem in production lines composed of a series of machines se...
A simulation model for improving production flow lines. with multiple products and parallel machines...
In the paper the problem of production orders sequencing in a mixed-model production system is consi...
Scheduling is one of the most important decisions in production control. An approach is proposed for...
This paper focuses on characterization of scheduling in systems with one or multiple machines. There...
Abstract: The production line of an enterprise with a flow method of organizing production...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
http://sic.ici.ro/sic2010_3/art04.phpInternational audienceThis paper considers balancing machining ...
In this paper we examine the various effects that workstations and rework loops with identical paral...
In this paper, we deal with the problem of optimally assigning and sequencing the operations of a se...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
This paper demonstrates the importance of choosing the correct statistical distributions for breakdo...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
In a mass production environment where resources such machines are shared, a balanced and scheduled ...
71 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1997.The second problem requires jo...
The paper addresses the flow control problem in production lines composed of a series of machines se...
A simulation model for improving production flow lines. with multiple products and parallel machines...
In the paper the problem of production orders sequencing in a mixed-model production system is consi...
Scheduling is one of the most important decisions in production control. An approach is proposed for...
This paper focuses on characterization of scheduling in systems with one or multiple machines. There...
Abstract: The production line of an enterprise with a flow method of organizing production...
A production system which consists of a number of parallel assembly lines is considered. On each lin...