In this Phd Thesis we introduce several procedures to solve the Multi-Skill Project Scheduling Problem (MSPSP). The aim is to find a schedule that minimizes the completion time (makespan) of a project, composed of a set of activities. Precedence relations and resource constraints are considered. In this problem, resources are staff members that master several skills. Thus, a given number of workers must be assigned to perform each skill required by an activity. Furthermore, we give a particula rimportance to exact methods for solving the Multi-Skill Project Scheduling Problem (MSPSP), since there are still several instances for which optimality is still to be proven. Nevertheless, with the purpose of solving big sized instances we also deve...
This chapter introduces a procedure to solve the Multi-Skill Project Scheduling Problem. The problem...
This paper addresses a multi-skilled extension of the resource-constrained project scheduling proble...
A multi-skilled project scheduling problem (MSPSP) has been generally presented to schedule a projec...
In this Phd Thesis we introduce several procedures to solve the Multi-Skill Project Scheduling Probl...
This document deals with the multi-skill project scheduling problem: a project has to be scheduled i...
International audienceThis is a summary of the author's PhD thesis supervised by P. Martineau and E....
This work introduces a procedure to solve the multi-skill project scheduling problem (MSPSP) (Néron ...
Les travaux de cette thèse réalisée sous contrat CIFRE portent sur des problématiques d’ordonnanceme...
In this paper, we present six extensions to the multi-skilled resource-constrained project schedulin...
The project structure arises in many fields of industry and services. It consists in performing a se...
We discuss the problem of project scheduling encountered in aircraft assembly workshop. The scheduli...
This chapter introduces a procedure to solve the Multi-Skill Project Scheduling Problem. The problem...
This paper addresses a multi-skilled extension of the resource-constrained project scheduling proble...
A multi-skilled project scheduling problem (MSPSP) has been generally presented to schedule a projec...
In this Phd Thesis we introduce several procedures to solve the Multi-Skill Project Scheduling Probl...
This document deals with the multi-skill project scheduling problem: a project has to be scheduled i...
International audienceThis is a summary of the author's PhD thesis supervised by P. Martineau and E....
This work introduces a procedure to solve the multi-skill project scheduling problem (MSPSP) (Néron ...
Les travaux de cette thèse réalisée sous contrat CIFRE portent sur des problématiques d’ordonnanceme...
In this paper, we present six extensions to the multi-skilled resource-constrained project schedulin...
The project structure arises in many fields of industry and services. It consists in performing a se...
We discuss the problem of project scheduling encountered in aircraft assembly workshop. The scheduli...
This chapter introduces a procedure to solve the Multi-Skill Project Scheduling Problem. The problem...
This paper addresses a multi-skilled extension of the resource-constrained project scheduling proble...
A multi-skilled project scheduling problem (MSPSP) has been generally presented to schedule a projec...