In this paper, we propose a framework for an interactive project scheduling system under limited resources. The framework includes a modelling module (MODEL) and a scheduling module (SCHEDULER). The modelling module MODEL allows the Decision Maker (DM) to develop his/her own model with features such as alternative operating modes for activities; renewable, nonrenewable and/or doubly-constrained resource constraints; general cash flow patterns, related to the realization of activities or events; and progress payments distributed over the project span. The performance criteria include the maximization of Net Present Value (NPV), and either the minimization of maximum tardiness (when a project due date exists) or the minimization of the projec...
The report gives an overview of resource-constrained project scheduling with time windows. First it ...
In multimode resource-constrained project scheduling, activity modes are selected and activity start...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
Proposes a heuristic iterative scheduling algorithm for the resource constrained project scheduling ...
In this study, a new heuristic approach to the resource constrained project scheduling problem is in...
Project management has become a widespread instrument enabling organizations to efficiently master t...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
This title presents a large variety of models and algorithms dedicated to the resource-constrained p...
Traditional critical path methods imply the assumption of unlimited availability of resources. Math...
The paper presents the algorithmic aspects of an interactive decision support system for the resourc...
It is the purpose of this article to review the various solutions that have been proposed for the re...
Abstract: Resource-constrained project scheduling involves the scheduling of project activities subj...
International audienceThis paper concerns project scheduling under resource constraints. Traditional...
For executing the activities of a project, one or several resources are required, which are in gener...
Resource-constrained project scheduling is an NPhard optimisation problem. There are many different ...
The report gives an overview of resource-constrained project scheduling with time windows. First it ...
In multimode resource-constrained project scheduling, activity modes are selected and activity start...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
Proposes a heuristic iterative scheduling algorithm for the resource constrained project scheduling ...
In this study, a new heuristic approach to the resource constrained project scheduling problem is in...
Project management has become a widespread instrument enabling organizations to efficiently master t...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
This title presents a large variety of models and algorithms dedicated to the resource-constrained p...
Traditional critical path methods imply the assumption of unlimited availability of resources. Math...
The paper presents the algorithmic aspects of an interactive decision support system for the resourc...
It is the purpose of this article to review the various solutions that have been proposed for the re...
Abstract: Resource-constrained project scheduling involves the scheduling of project activities subj...
International audienceThis paper concerns project scheduling under resource constraints. Traditional...
For executing the activities of a project, one or several resources are required, which are in gener...
Resource-constrained project scheduling is an NPhard optimisation problem. There are many different ...
The report gives an overview of resource-constrained project scheduling with time windows. First it ...
In multimode resource-constrained project scheduling, activity modes are selected and activity start...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...