This report covers an analysis of the fire protection features within the Warren Baker Center for Science and Mathematics Building. This document first discusses the prescriptive requirements for the building as determined by applicable code. The items to be discussed, as they relate to prescriptive requirements, include the means of egress and relatable components, fire resistive construction, fire alarm system, fire sprinkler system, and smoke control system. All components were analyzed and compared to each applicable code to assess whether these specific fire protection systems were designed correctly. In addition to an analysis of the prescriptive measures in this facility, this report also discussed three specific theoretical performa...
This report details the fire and life safety analysis of a Fresno Elementary School. Both prescripti...
This document is the report of the culminating experience as part of the master’s program in fire pr...
A fire and life safety analysis was completed for Building V as part of a culminating project in the...
Analyzing the fire protection features of the Warren J. Baker Center for Science and Mathematics Bui...
This project report analyzes various aspects of fire protection and life safety design for a Univers...
A Fire and Life Safety Analysis was performed as an academic exercise as part of the MS Fire Protect...
This report analyzes the fire protection and life safety systems of the Christopher Cohan Center. Th...
A Fire Protection Engineering Analysis was performed on TA‐3‐0040, Physics Building at the Los Alamo...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
The Life Safety and Fire Protection systems in Cal Poly’s Center for Science and Mathematics (CSM) w...
The Life Safety and Fire Protection systems in Cal Poly’s Center for Science and Mathematics (CSM) w...
The Life Safety and Fire Protection systems in Cal Poly’s Center for Science and Mathematics (CSM) w...
This report details the fire and life safety analysis of a Fresno Elementary School. Both prescripti...
This project was performed as part of the requirements for completion of the Fire Protection Enginee...
This report details the fire and life safety analysis of a Fresno Elementary School. Both prescripti...
This document is the report of the culminating experience as part of the master’s program in fire pr...
A fire and life safety analysis was completed for Building V as part of a culminating project in the...
Analyzing the fire protection features of the Warren J. Baker Center for Science and Mathematics Bui...
This project report analyzes various aspects of fire protection and life safety design for a Univers...
A Fire and Life Safety Analysis was performed as an academic exercise as part of the MS Fire Protect...
This report analyzes the fire protection and life safety systems of the Christopher Cohan Center. Th...
A Fire Protection Engineering Analysis was performed on TA‐3‐0040, Physics Building at the Los Alamo...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
In partial fulfillment of the requirements for the Degree of Masters of Science in Fire Protection...
The Life Safety and Fire Protection systems in Cal Poly’s Center for Science and Mathematics (CSM) w...
The Life Safety and Fire Protection systems in Cal Poly’s Center for Science and Mathematics (CSM) w...
The Life Safety and Fire Protection systems in Cal Poly’s Center for Science and Mathematics (CSM) w...
This report details the fire and life safety analysis of a Fresno Elementary School. Both prescripti...
This project was performed as part of the requirements for completion of the Fire Protection Enginee...
This report details the fire and life safety analysis of a Fresno Elementary School. Both prescripti...
This document is the report of the culminating experience as part of the master’s program in fire pr...
A fire and life safety analysis was completed for Building V as part of a culminating project in the...