In this study, a three-machine flexible robotic manufacturing cell in which the CNC machines are used is considered. These machines are highly flexible and are capable of performing several different operations. Each machine is assumed to be capable of performing all of the required operations of each part. As a consequence of this assumption, a new class of cycles is defined and three simple and widely used cycles among this class is proposed. The regions of optimality for these cycles as well as the worst case performances are derived. Copyright © 2006 IFAC
This paper investigates the scheduling of a rotationally arranged robotic cell with the Multi-Functi...
We consider a robotic cell served by a dual-gripper robot that consists of identical CNC machines pl...
AbstractThe introduction of robotic cells to manufacturing systems improved the efficiency, producti...
In this study, we consider a flexible manufacturing cell (FMC) processing identical parts on which t...
In this study, an m-machine flexible robotic manufacturing cell consisting of CNC machines is consid...
This paper considers the scheduling problems arising in two- and three-machine manufacturing cells c...
In this study, we deal with the robotic cell scheduling problem with two machines and identical part...
Consider a manufacturing cell of two identical CNC machines and a material handling robot. Identical...
In this paper, we study the problem of two-machine, identical parts robotic cell scheduling with ope...
Cataloged from PDF version of article.This paper considers the scheduling problem arising in two-mac...
The focus of this study is a robot centered cell consisting of m computer numerical control (CNC) ma...
In this study, we deal with the robotic cell scheduling problem with two machines and identical part...
The current study deals with a bicriteria scheduling problem arising in an m-machine robotic cell co...
Flexible robotic cells are used to produce standardized items at a high production speed. In this st...
Optimization of robotic workcells is a growing concern in automated manufacturing systems. This stud...
This paper investigates the scheduling of a rotationally arranged robotic cell with the Multi-Functi...
We consider a robotic cell served by a dual-gripper robot that consists of identical CNC machines pl...
AbstractThe introduction of robotic cells to manufacturing systems improved the efficiency, producti...
In this study, we consider a flexible manufacturing cell (FMC) processing identical parts on which t...
In this study, an m-machine flexible robotic manufacturing cell consisting of CNC machines is consid...
This paper considers the scheduling problems arising in two- and three-machine manufacturing cells c...
In this study, we deal with the robotic cell scheduling problem with two machines and identical part...
Consider a manufacturing cell of two identical CNC machines and a material handling robot. Identical...
In this paper, we study the problem of two-machine, identical parts robotic cell scheduling with ope...
Cataloged from PDF version of article.This paper considers the scheduling problem arising in two-mac...
The focus of this study is a robot centered cell consisting of m computer numerical control (CNC) ma...
In this study, we deal with the robotic cell scheduling problem with two machines and identical part...
The current study deals with a bicriteria scheduling problem arising in an m-machine robotic cell co...
Flexible robotic cells are used to produce standardized items at a high production speed. In this st...
Optimization of robotic workcells is a growing concern in automated manufacturing systems. This stud...
This paper investigates the scheduling of a rotationally arranged robotic cell with the Multi-Functi...
We consider a robotic cell served by a dual-gripper robot that consists of identical CNC machines pl...
AbstractThe introduction of robotic cells to manufacturing systems improved the efficiency, producti...