International audienceThe 45 km-long reach of the Rhine River from Kembs to Breisach has been heavily impacted by engineering works during the last two centuries. The Kembs dam and the lateral “Grand Canal d’Alsace” achieved in 1959 induced significant decrease in sediment transport and diversion of most of the flow in the lateral canal so that the by-passed “Old Rhine” runs now a minimum flow (3% of the mean annual discharge during 300 days per year). Two combined approaches were performed to understand the Old Rhine morphological response to “dewatering”, peak flow reduction and sediment transport disruption in particular the vegetation expansion process and its potential feedback impacts on the channel hydraulics and the sediment transpo...