Namibia is a developing country with an ambitious policy to improve its road infrastructure in order to alleviate poverty through, among other activities, employment creation and provision of all-weather and reliable access to hospitals, schools, markets and other social amenities. Above all, Namibia is striving to integrate with the rest of the Southern African Development Community (SADC) region and realize some of the potential traditional economic benefits that come with such investment. Much to the major stakeholders’ disappointment, Namibia has not been spared from excessive cost and time overruns associated with infrastructure development projects in general and road construction in particular. The aim of this study was to investigat...
Abstract: Good performance increase productivity in the construction projects and it contribute posi...
A thesis submitted to the Faculty of Commerce, Law and Management, University of the Witwatersrand ...
Philosophiae Doctor - PhDThere is considerable theoretical and empirical research devoted to the stu...
Infrastructure development, including roads, requires large capital investments coupled with proper ...
Thesis (PhD)--Stellenbosch University, 2020.ENGLISH SUMMARY : Namibia established a second-generatio...
This paper uses Cost-Effectiveness Analysis (CEA) to assist the Namibian Roads Authority cost-effect...
The major aim of the study was to examine the short and long-run relationships and directional causa...
This research examined the effect of an improved road network on the factors economic growth, road s...
Cost and time are one of the two primary parameters that require due considerations throughout the p...
Construction projects have a worldwide history of being completed beyond their schedule durations. R...
Road infrastructure while delivering economic benefits, generates negative externalities and places ...
Building and infrastructure projects at the North-West Province Department of Public Works and Roads...
Magister Administrationis - MAdminThis research study focuses on the way the Namibian public sector ...
Malawi is a landlocked country and roads are an integral part of the transportation system, therefor...
When determining the success of a road project, cost is one of the most important variables to consi...
Abstract: Good performance increase productivity in the construction projects and it contribute posi...
A thesis submitted to the Faculty of Commerce, Law and Management, University of the Witwatersrand ...
Philosophiae Doctor - PhDThere is considerable theoretical and empirical research devoted to the stu...
Infrastructure development, including roads, requires large capital investments coupled with proper ...
Thesis (PhD)--Stellenbosch University, 2020.ENGLISH SUMMARY : Namibia established a second-generatio...
This paper uses Cost-Effectiveness Analysis (CEA) to assist the Namibian Roads Authority cost-effect...
The major aim of the study was to examine the short and long-run relationships and directional causa...
This research examined the effect of an improved road network on the factors economic growth, road s...
Cost and time are one of the two primary parameters that require due considerations throughout the p...
Construction projects have a worldwide history of being completed beyond their schedule durations. R...
Road infrastructure while delivering economic benefits, generates negative externalities and places ...
Building and infrastructure projects at the North-West Province Department of Public Works and Roads...
Magister Administrationis - MAdminThis research study focuses on the way the Namibian public sector ...
Malawi is a landlocked country and roads are an integral part of the transportation system, therefor...
When determining the success of a road project, cost is one of the most important variables to consi...
Abstract: Good performance increase productivity in the construction projects and it contribute posi...
A thesis submitted to the Faculty of Commerce, Law and Management, University of the Witwatersrand ...
Philosophiae Doctor - PhDThere is considerable theoretical and empirical research devoted to the stu...