NPS NRP Project PosterCost and Operational Evaluations of Centralized vs. Distributed Class IX InventoriesHQMC Installations and Logistics (I&L)This research is supported by funding from the Naval Postgraduate School, Naval Research Program (PE 0605853N/2098). https://nps.edu/nrpChief of Naval Operations (CNO)Approved for public release. Distribution is unlimited.
The purpose of this thesis is to provide an analysis of the FY89 unit costs at a consolidated supply...
The purpose of the research conducted was to identify the main contributing factor for inaccurate in...
The purpose of the project is to conduct unbiased research to determine the optimal type and quantit...
NPS NRP Executive SummaryCost and Operational Evaluations of Centralized vs. Distributed Class IX In...
The U.S. Marine Corps utilizes its Supply Management Units (SMU) to provide Class IX repair parts su...
NPS NRP Project PosterThe study will identify the lead time segments/sub-segments in the six key att...
1999Master's ThesisPDFThesisInventory controlLinear programmingLogisticsNaval architectureMilitary v...
NPS NRP Executive SummaryManaging Materiel Distribution in an Uncertain EnvironmentN4 - Fleet Readin...
The Department of the Navy (DON) is faced with the need to improve inventory accuracy in order to in...
The United States Marine Corps (USMC) Installation & Logistics Command (I&L) seeks to store appropri...
Student Research Poster ShowThe purpose of this MBA project is to provide a critical review of Naval...
Minimized safety level investment, while achieving high service levels and low customer wait time, i...
NPS NRP Executive SummaryAoA Paradigm for Early Visibility of Logistics and Cost in the Acquisition ...
NPS NRP Executive SummaryProject Summary: Evolving anti-ship ballistic missiles are enhancing the ef...
Student Research Poster ShowThe primary mission of the Marine Corpsメ Supply Management Unit (SMU) is...
The purpose of this thesis is to provide an analysis of the FY89 unit costs at a consolidated supply...
The purpose of the research conducted was to identify the main contributing factor for inaccurate in...
The purpose of the project is to conduct unbiased research to determine the optimal type and quantit...
NPS NRP Executive SummaryCost and Operational Evaluations of Centralized vs. Distributed Class IX In...
The U.S. Marine Corps utilizes its Supply Management Units (SMU) to provide Class IX repair parts su...
NPS NRP Project PosterThe study will identify the lead time segments/sub-segments in the six key att...
1999Master's ThesisPDFThesisInventory controlLinear programmingLogisticsNaval architectureMilitary v...
NPS NRP Executive SummaryManaging Materiel Distribution in an Uncertain EnvironmentN4 - Fleet Readin...
The Department of the Navy (DON) is faced with the need to improve inventory accuracy in order to in...
The United States Marine Corps (USMC) Installation & Logistics Command (I&L) seeks to store appropri...
Student Research Poster ShowThe purpose of this MBA project is to provide a critical review of Naval...
Minimized safety level investment, while achieving high service levels and low customer wait time, i...
NPS NRP Executive SummaryAoA Paradigm for Early Visibility of Logistics and Cost in the Acquisition ...
NPS NRP Executive SummaryProject Summary: Evolving anti-ship ballistic missiles are enhancing the ef...
Student Research Poster ShowThe primary mission of the Marine Corpsメ Supply Management Unit (SMU) is...
The purpose of this thesis is to provide an analysis of the FY89 unit costs at a consolidated supply...
The purpose of the research conducted was to identify the main contributing factor for inaccurate in...
The purpose of the project is to conduct unbiased research to determine the optimal type and quantit...