International audienceWe propose a quantitative safety analysis of a critical plant with respect to the occurrence of an earthquake, extending the envelope of the study to the interdependent infrastructures which are connected to it in a "system-of-systems" - like fashion. As a mock-up case study, we consider the impacts produced on a nuclear power plant (the critical plant) embedded in the connected power and water distribution, and transportation networks which support its operation. The Probabilistic Seismic Hazard Analysis of such system of systems is carried out by Fault Tree analysis and Monte Carlo simulation. As outcome of the analysis, the probability that the nuclear power plant reaches an unsafe state is computed for different ea...
Nuclear power plants (NPPs) generated about 10% of the world’s electricity in 2020 and about 1/3 of ...
The vulnerability of process plants to natural hazards has been demonstrated in the last decades by ...
A probabilistic seismic hazard analysis (PSHA) has been conducted as part of the Safety Case justifi...
International audienceWe propose a quantitative safety analysis of a critical plant with respect to ...
International audienceWe adopt a 'system-of-systems' framework of analysis, previously presented by ...
International audienceWe consider a critical plant exposed to risk from external events. We propose ...
We adopt a ‘system-of-systems ’ framework of analysis, previously presented by the authors, to inclu...
International audienceWe extend a system-of-systems framework previously proposed by the authors to ...
The seismic safety of a nuclear power plant (NPP) is assessed based on the reliable functioning of t...
Nuclear power may be our best chance at a permanent solution to the world's energy challenges, owing...
IEEE Adequate ac power is required for decay heat removal in nuclear power plants. Station blackout ...
The harnessing of nuclear energy as means to provide an alternative source of energy has helped prov...
Adequate ac power is required for decay heat removal in nuclear power plants. Station blackout (SBO)...
The aim of this paper is to present a probabilistic framework useful for the risk ass...
This paper proposes an improved approach to external event probabilistic risk assessment for multi-u...
Nuclear power plants (NPPs) generated about 10% of the world’s electricity in 2020 and about 1/3 of ...
The vulnerability of process plants to natural hazards has been demonstrated in the last decades by ...
A probabilistic seismic hazard analysis (PSHA) has been conducted as part of the Safety Case justifi...
International audienceWe propose a quantitative safety analysis of a critical plant with respect to ...
International audienceWe adopt a 'system-of-systems' framework of analysis, previously presented by ...
International audienceWe consider a critical plant exposed to risk from external events. We propose ...
We adopt a ‘system-of-systems ’ framework of analysis, previously presented by the authors, to inclu...
International audienceWe extend a system-of-systems framework previously proposed by the authors to ...
The seismic safety of a nuclear power plant (NPP) is assessed based on the reliable functioning of t...
Nuclear power may be our best chance at a permanent solution to the world's energy challenges, owing...
IEEE Adequate ac power is required for decay heat removal in nuclear power plants. Station blackout ...
The harnessing of nuclear energy as means to provide an alternative source of energy has helped prov...
Adequate ac power is required for decay heat removal in nuclear power plants. Station blackout (SBO)...
The aim of this paper is to present a probabilistic framework useful for the risk ass...
This paper proposes an improved approach to external event probabilistic risk assessment for multi-u...
Nuclear power plants (NPPs) generated about 10% of the world’s electricity in 2020 and about 1/3 of ...
The vulnerability of process plants to natural hazards has been demonstrated in the last decades by ...
A probabilistic seismic hazard analysis (PSHA) has been conducted as part of the Safety Case justifi...