During the EUROCORE project in 1989 at Summit, Central Greenland, a 304.8-m long ice core of 105mm diameter was retrieved with an electromechanical drill. A dry drilling technique was used in order to minimise contamination of the ice. A special drill head with a small chipping depth was designed to assure minimal fracturing of the core. The quality was excellent to the depth of 180m, but then deteriorated due to increasing brittleness of the ice. Down to 280m we were able to maintain the mean length of unbroken core pieces above 0.1m by reducing the pitch from 7 to 2mm. The sticking of the consequently finer chips to the drill barrels was reduced by treating the barrels repeatedly with a silicone-based wax solution. Hole enlargement cutter...
In the mid-1990s, excellent results from the GRIP and GISP2 deep drilling projects in Greenland open...
During the last twenty years over 10000m of ice core have been recovered through the use of antifree...
This technical note presents three scales of drilling infrastructure for comparison. These three met...
During the EUROCORE project in 1989 at Summit, Central Greenland, a 304.8-m long ice core of 105mm d...
Drilling an ice core through an ice sheet (typically 2000 to 3000 m thick) is a technical challenge ...
Deep ice core drilling was carried out at Dome Fuji, Antarctica in 1995 and 1996 from the bottom of ...
Deep ice core drilling was carried out at Dome Fuji, Antarctica in 1995 and 1996 from the bottom of ...
In May 1999, drilling of a borehole through the entire ice strata (around 750 m) was initiated on t...
A common fear for all ice drillers is a stuck drill. A less severe but important concern is a foreig...
The British Antarctic Survey Rapid Access Isotope Drill is an innovative new class of electromechani...
A 171m deep ice core from the surface to the bottom has been successfully drilled on the West Belukh...
The Dome Summit South (DSS) ice drilling project was designed to obtain a full depth ice core for hi...
A total of 11 ice cores to a maximum depth of 460 m have been obtained over the past 3 years from hi...
ABSTRACT. The Deep Ice Sheet Coring (DISC) drill developed by Ice Coring and Drilling Services under...
The British Antarctic Survey, in collaboration with Laboratoire de Glaciologie et Géophysique de l’...
In the mid-1990s, excellent results from the GRIP and GISP2 deep drilling projects in Greenland open...
During the last twenty years over 10000m of ice core have been recovered through the use of antifree...
This technical note presents three scales of drilling infrastructure for comparison. These three met...
During the EUROCORE project in 1989 at Summit, Central Greenland, a 304.8-m long ice core of 105mm d...
Drilling an ice core through an ice sheet (typically 2000 to 3000 m thick) is a technical challenge ...
Deep ice core drilling was carried out at Dome Fuji, Antarctica in 1995 and 1996 from the bottom of ...
Deep ice core drilling was carried out at Dome Fuji, Antarctica in 1995 and 1996 from the bottom of ...
In May 1999, drilling of a borehole through the entire ice strata (around 750 m) was initiated on t...
A common fear for all ice drillers is a stuck drill. A less severe but important concern is a foreig...
The British Antarctic Survey Rapid Access Isotope Drill is an innovative new class of electromechani...
A 171m deep ice core from the surface to the bottom has been successfully drilled on the West Belukh...
The Dome Summit South (DSS) ice drilling project was designed to obtain a full depth ice core for hi...
A total of 11 ice cores to a maximum depth of 460 m have been obtained over the past 3 years from hi...
ABSTRACT. The Deep Ice Sheet Coring (DISC) drill developed by Ice Coring and Drilling Services under...
The British Antarctic Survey, in collaboration with Laboratoire de Glaciologie et Géophysique de l’...
In the mid-1990s, excellent results from the GRIP and GISP2 deep drilling projects in Greenland open...
During the last twenty years over 10000m of ice core have been recovered through the use of antifree...
This technical note presents three scales of drilling infrastructure for comparison. These three met...