Resource constrained project scheduling problems are very difficult to solve to optimality. Because of the computational complexity, scheduling heuristics have been found useful for large deterministic problems. However, these scheduling heuristics have not been applied to problems with stochastic task durations. Heuristics are often combined to try to achieve better performance. When this is done, a search over all possible combinations is generally required. This is again a very computationally intensive task, especially for stochastic problems. In this paper, we demonstrate how a genetic algorithm can be used to determine the best linear combination of scheduling heuristics. A simulation model is used to evaluate the performance of each ...
In this paper we consider the resource-constrained project scheduling problem (RCPSP) with makespan ...
The project scheduling problem domain is an important research and applications area of engineering ...
In a multi-project environment, many projects are to be completed that rely on a common pool of scar...
There are limited solution techniques available for resource constrained project scheduling problems...
Abstract—This paper considers a project scheduling problem under uncertainty, which belongs to a cla...
This study proposes a novel hyper-heuristic based two-stage genetic programming framework (HH-TGP) t...
In project scheduling studies, to the best of our knowledge, the hyper-heuristic collaborative sched...
This paper presents a genetic algorithm for the resource constrained multi-project scheduling proble...
Project scheduling models with resource constraints and multi-mode activities aims to create a sched...
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatoria...
Multi-project management and uncertain environment are very common factors, and they bring greater c...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
Production scheduling has attracted the interest of production economics communities for d...
The project scheduling problem domain is an important research and applications area of engineering ...
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCP...
In this paper we consider the resource-constrained project scheduling problem (RCPSP) with makespan ...
The project scheduling problem domain is an important research and applications area of engineering ...
In a multi-project environment, many projects are to be completed that rely on a common pool of scar...
There are limited solution techniques available for resource constrained project scheduling problems...
Abstract—This paper considers a project scheduling problem under uncertainty, which belongs to a cla...
This study proposes a novel hyper-heuristic based two-stage genetic programming framework (HH-TGP) t...
In project scheduling studies, to the best of our knowledge, the hyper-heuristic collaborative sched...
This paper presents a genetic algorithm for the resource constrained multi-project scheduling proble...
Project scheduling models with resource constraints and multi-mode activities aims to create a sched...
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatoria...
Multi-project management and uncertain environment are very common factors, and they bring greater c...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
Production scheduling has attracted the interest of production economics communities for d...
The project scheduling problem domain is an important research and applications area of engineering ...
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCP...
In this paper we consider the resource-constrained project scheduling problem (RCPSP) with makespan ...
The project scheduling problem domain is an important research and applications area of engineering ...
In a multi-project environment, many projects are to be completed that rely on a common pool of scar...