In the field of construction works planning, workspaces must be considered as limited resources, in the same way as labour crews and equipment. Being the work-related spatial information both contextual and affected by construction site's dynamics, a real-time management approach based on lean principles must be adopted. In this paper, a BIM-based serious game engine, framed within a high-level system architecture, is presented to enhance work progress management. The generation of a geometric model to perform look-ahead simulations for predicting spatial conflicts is showcased relatively to a retrofitted residential building
The introduction of the Building Information Modeling (BIM) approach has facilitated the management...
In construction management, a spatial conflict between two activities is generally identified as the...
The ASHVIN Partners have published fresh Proceedings at the 31st Annual Conference of the Internatio...
In the field of construction works planning, workspaces must be considered as limited resources, in ...
In construction projects, the space required for executing each activity is unanimously recognized a...
Spatial conflicts affect crews’ productivity and workers’ safety. The idea of considering workspaces...
Workspace demand changes across space and time, stressing the need to consider space as a limited an...
Nei cantieri edili, quali contesti altamente dinamici, lo spazio richiesto dalle attività muta conti...
Workspace conflicts and building components can happen in different forms and both permanently and t...
This work addresses the problem arising on all construction sites: the occurrence of workspace inter...
Extensive research efforts have been made in construction simulation. Nevertheless, work space is ne...
While unavoidable, inspections, progress monitoring, and comparing as-planned with as-built conditio...
The introduction of the Building Information Modeling (BIM) approach has facilitated the management...
In construction management, a spatial conflict between two activities is generally identified as the...
The ASHVIN Partners have published fresh Proceedings at the 31st Annual Conference of the Internatio...
In the field of construction works planning, workspaces must be considered as limited resources, in ...
In construction projects, the space required for executing each activity is unanimously recognized a...
Spatial conflicts affect crews’ productivity and workers’ safety. The idea of considering workspaces...
Workspace demand changes across space and time, stressing the need to consider space as a limited an...
Nei cantieri edili, quali contesti altamente dinamici, lo spazio richiesto dalle attività muta conti...
Workspace conflicts and building components can happen in different forms and both permanently and t...
This work addresses the problem arising on all construction sites: the occurrence of workspace inter...
Extensive research efforts have been made in construction simulation. Nevertheless, work space is ne...
While unavoidable, inspections, progress monitoring, and comparing as-planned with as-built conditio...
The introduction of the Building Information Modeling (BIM) approach has facilitated the management...
In construction management, a spatial conflict between two activities is generally identified as the...
The ASHVIN Partners have published fresh Proceedings at the 31st Annual Conference of the Internatio...