The increased of infrastructure development creates competition among the construction service providers. A good management is needed for construction service providers so that they do not experience losses and can be professional in working on a project. One of the problems in construction projects is changes in the contract (Contract Change Order) which can affect cost control. So this research is needed which develops previous research with the title "Evaluation of Important Factors Causing Cost Overrun in the Sragen Regency APBD Road Project in 2017 and 2018" which was then developed with the title " Analysis Of The Influence Of Contract Change Order (CCO) On Cost Overrun In The Sragen Regency APBD Road Project In 2017-2018”. This resea...
Pada proyek yang diselenggarakan oleh Pemerintah, variation order atau lebih sering dikenal Contract...
ABSTRAK Afandi, Abdullah. 2017. Faktor Penyebab Terjadinya Contract Change Order (CCO) dan Pengaru...
Dalam setiap proyek konstruksi selalu terjadi perubahan atau yang biasa disebut dengan change order ...
Construction industry activities are increasing. Construction industry players need to be prepared t...
Abstrak Pekerjaan konstruksi melibatkan berbagai unsur beserta faktor pendukungnya untuk menjamin ke...
Abstract: Factors that often happens when held CCO (Contract Change Order) Is the repeated coordinat...
Change Order is a change that occurs in a construction project and cannot be avoided. Analysis of ch...
ABSTRACT Change Order (CO) is a change of work in a construction project. CO is very difficult to av...
Thisresearch was motivated by a lot of demands of contract change order addendum in the relatedagenc...
Thisresearch was motivated by a lot of demands of contract change order addendum in the relatedagenc...
In the road construction project implementation stage by PT. Istaka Karya, there are often problems ...
ANALYSIS OF THE IMPACT OF CONTRACT CHANGE ORDER ON COST AND TIME (Case Study on PT SHOENARY JAVANESI...
The research was conducted using descriptive statistical methods, namely by analyzing data and quest...
The aim of this research is to identify the main causes and effects of CCO in the construction of th...
Proyek konstruksi di kota besar pernah mengalami terjadinya cost overruns pada saat pembangunan kons...
Pada proyek yang diselenggarakan oleh Pemerintah, variation order atau lebih sering dikenal Contract...
ABSTRAK Afandi, Abdullah. 2017. Faktor Penyebab Terjadinya Contract Change Order (CCO) dan Pengaru...
Dalam setiap proyek konstruksi selalu terjadi perubahan atau yang biasa disebut dengan change order ...
Construction industry activities are increasing. Construction industry players need to be prepared t...
Abstrak Pekerjaan konstruksi melibatkan berbagai unsur beserta faktor pendukungnya untuk menjamin ke...
Abstract: Factors that often happens when held CCO (Contract Change Order) Is the repeated coordinat...
Change Order is a change that occurs in a construction project and cannot be avoided. Analysis of ch...
ABSTRACT Change Order (CO) is a change of work in a construction project. CO is very difficult to av...
Thisresearch was motivated by a lot of demands of contract change order addendum in the relatedagenc...
Thisresearch was motivated by a lot of demands of contract change order addendum in the relatedagenc...
In the road construction project implementation stage by PT. Istaka Karya, there are often problems ...
ANALYSIS OF THE IMPACT OF CONTRACT CHANGE ORDER ON COST AND TIME (Case Study on PT SHOENARY JAVANESI...
The research was conducted using descriptive statistical methods, namely by analyzing data and quest...
The aim of this research is to identify the main causes and effects of CCO in the construction of th...
Proyek konstruksi di kota besar pernah mengalami terjadinya cost overruns pada saat pembangunan kons...
Pada proyek yang diselenggarakan oleh Pemerintah, variation order atau lebih sering dikenal Contract...
ABSTRAK Afandi, Abdullah. 2017. Faktor Penyebab Terjadinya Contract Change Order (CCO) dan Pengaru...
Dalam setiap proyek konstruksi selalu terjadi perubahan atau yang biasa disebut dengan change order ...