This deliverable starts with the proposal of Dispatcher3 and incorporates the development produced during the first five months of the project: activities on different workpackages, interaction with Topic Manager and Project Officer, and input received during the first Advisory Board meeting and follow up consultations. This deliverable presents the definition of Dispatcher3 concept and methodology. It includes the high level the requirements of the prototype, preliminary data requirements, preliminary technical infrastructure requirements, preliminary data processing and analytic techniques identification and a preliminary definition of scenarios. The deliverable aims at defining the view of the consortium on the project at these early s...
This deliverable reports on the organisation and results obtained from the third and fourth editions...
This deliverable provides the methodological framework which will enable the execution of the verifi...
The deliverable provides the results from the verification and validation activities within Dispatch...
This document is the Communication, Dissemination and Exploitation Plan (D7.1) of the Clean Sky 2 In...
This document is the Communication, Dissemination and Exploitation Plan (D7.1) of the Clean Sky 2 In...
This deliverable describes the decision making approach that will be followed in Pilot3. It present...
This deliverable is the technical description of the final release of Dispatcher3 prototype includin...
In this deliverable, we present a verification and validation plan designed to carry out all necessa...
This deliverable along with deliverable D4.2. Prototype Package (first release) is the release of th...
This deliverable along with D4.3 – Architecture and prototype description are the release of the fin...
This deliverable summarises the activities performed in WP3 – Domain driven data engineering and ana...
This deliverable presents a report of the communication, dissemination and exploitation activities c...
The deliverable provides the outcomes from the verification and validation activities carried during...
The deliverable presents the preparation for data collection for each OS. It elaborates on prerequis...
The preparation, organisation and the conclusions from the three thematic challenge workshops held i...
This deliverable reports on the organisation and results obtained from the third and fourth editions...
This deliverable provides the methodological framework which will enable the execution of the verifi...
The deliverable provides the results from the verification and validation activities within Dispatch...
This document is the Communication, Dissemination and Exploitation Plan (D7.1) of the Clean Sky 2 In...
This document is the Communication, Dissemination and Exploitation Plan (D7.1) of the Clean Sky 2 In...
This deliverable describes the decision making approach that will be followed in Pilot3. It present...
This deliverable is the technical description of the final release of Dispatcher3 prototype includin...
In this deliverable, we present a verification and validation plan designed to carry out all necessa...
This deliverable along with deliverable D4.2. Prototype Package (first release) is the release of th...
This deliverable along with D4.3 – Architecture and prototype description are the release of the fin...
This deliverable summarises the activities performed in WP3 – Domain driven data engineering and ana...
This deliverable presents a report of the communication, dissemination and exploitation activities c...
The deliverable provides the outcomes from the verification and validation activities carried during...
The deliverable presents the preparation for data collection for each OS. It elaborates on prerequis...
The preparation, organisation and the conclusions from the three thematic challenge workshops held i...
This deliverable reports on the organisation and results obtained from the third and fourth editions...
This deliverable provides the methodological framework which will enable the execution of the verifi...
The deliverable provides the results from the verification and validation activities within Dispatch...