During construction and maintenance of buildings it is necessary to transfer the height from the ground level to each floor. The transfer is realized by various methods, e.g. by geometric levelling, geometric levelling with the use of geodetic measuring tape, or by trigonometric levelling. The authors developed and made a set of measuring devices consisting of a benchmark table and plane mirrors enabling the transfer of height with the use of an electronic total station equipped with an option of measuring distance without using reflector prisms. The paper presents the results of experimental studies carried out within the building of The Faculty of Environmental Engineering and Geodesy of the Wrocław University of Environmental and Life Sc...
ABSTRACT: Geodetic investments support in the scope of modernization the existing sections of railwa...
Recent advances in sensor technology would lead to a new trend of instrumentation system that can be...
In engineering and surveying, establishing a temporary bench mark (TBM) that have a reliable reduce...
A Leica NA3000 electronic digital level, one of the newly-introduced heighting equipment, was evalua...
In academic studies and engineering works, it is required to determine height differences between po...
College of Engineering, King Saud University, P.O. Box 800, Riyadh 11421, Saudi Arabia Phone: +966-1...
The paper deals with the height measurement in-strumentation and means and methods for an accuracy a...
Applications in geodesy and engineering surveying require the determination of the heights of the ve...
Currently, trigonometric levelling is becoming increasingly widespread, mainly due to the increase i...
Levelling and trigonometric height measurements are the methods that are mostly used today for heigh...
The quasi-geoid/geoid can be determined from the Global Positioning System (GPS) ellipsoidal height ...
The paper deals with the height measurement in-strumentation and means and methods for an accuracy a...
The measurement of the levelling network in a part of Brno The theoretical part of this study deals ...
Available from British Library Document Supply Centre- DSC:D43414/82 / BLDSC - British Library Docum...
The subject of this thesis is comparation methods of measuring elevation of experimental points on t...
ABSTRACT: Geodetic investments support in the scope of modernization the existing sections of railwa...
Recent advances in sensor technology would lead to a new trend of instrumentation system that can be...
In engineering and surveying, establishing a temporary bench mark (TBM) that have a reliable reduce...
A Leica NA3000 electronic digital level, one of the newly-introduced heighting equipment, was evalua...
In academic studies and engineering works, it is required to determine height differences between po...
College of Engineering, King Saud University, P.O. Box 800, Riyadh 11421, Saudi Arabia Phone: +966-1...
The paper deals with the height measurement in-strumentation and means and methods for an accuracy a...
Applications in geodesy and engineering surveying require the determination of the heights of the ve...
Currently, trigonometric levelling is becoming increasingly widespread, mainly due to the increase i...
Levelling and trigonometric height measurements are the methods that are mostly used today for heigh...
The quasi-geoid/geoid can be determined from the Global Positioning System (GPS) ellipsoidal height ...
The paper deals with the height measurement in-strumentation and means and methods for an accuracy a...
The measurement of the levelling network in a part of Brno The theoretical part of this study deals ...
Available from British Library Document Supply Centre- DSC:D43414/82 / BLDSC - British Library Docum...
The subject of this thesis is comparation methods of measuring elevation of experimental points on t...
ABSTRACT: Geodetic investments support in the scope of modernization the existing sections of railwa...
Recent advances in sensor technology would lead to a new trend of instrumentation system that can be...
In engineering and surveying, establishing a temporary bench mark (TBM) that have a reliable reduce...