The traditional (e.g. Gantt chart) and modern (network modeling) scheduling techniques reach their limits quite soon in case of large projects. In case of thousands of activities, the current methods do not provide an effective evaluation. This paper would like to show tools that can solve the above-mentioned problem. We have several options for handling these matters effectively. For example: fine scheduling based on resource and cost use, innovative solutions for printing of complex schedules. The latter includes the poster-like presentation of several plan details. These applications can be considered novelties in project planning methodolog
Calendar planning is a key tool for efficient management applied in many industries: power, oil & ga...
With the rising complexity of construction projects, the need to manage this complexity rises. The c...
The paper presents a method of priority scheduling that is useful during the planning of multiple-st...
Planning and scheduling are considered as one of the most difficult but most important processes fro...
Purpose The implementation and control processes of project planning and scheduling involve a wide r...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
A new construction scheduling technique, developed on the basis of progress charts and Gantt (bar) c...
The objectives of this thesis are to evaluate scheduling methods and most common construction projec...
Planning and scheduling have become an essential part of any project for the timely and economical c...
Project management has become a widespread instrument enabling organizations to efficiently master t...
Construction project managers are interested in completing their projects on time and within budget....
An object-oriented model is presented for optimized scheduling of repetitive construction projects s...
A complex construction program usually consists of a group of interrelated projects with different l...
A realistic schedule is often defined as a critical success factor in project management research. P...
Calendar planning is a key tool for efficient management applied in many industries: power, oil & ga...
With the rising complexity of construction projects, the need to manage this complexity rises. The c...
The paper presents a method of priority scheduling that is useful during the planning of multiple-st...
Planning and scheduling are considered as one of the most difficult but most important processes fro...
Purpose The implementation and control processes of project planning and scheduling involve a wide r...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
A new construction scheduling technique, developed on the basis of progress charts and Gantt (bar) c...
The objectives of this thesis are to evaluate scheduling methods and most common construction projec...
Planning and scheduling have become an essential part of any project for the timely and economical c...
Project management has become a widespread instrument enabling organizations to efficiently master t...
Construction project managers are interested in completing their projects on time and within budget....
An object-oriented model is presented for optimized scheduling of repetitive construction projects s...
A complex construction program usually consists of a group of interrelated projects with different l...
A realistic schedule is often defined as a critical success factor in project management research. P...
Calendar planning is a key tool for efficient management applied in many industries: power, oil & ga...
With the rising complexity of construction projects, the need to manage this complexity rises. The c...
The paper presents a method of priority scheduling that is useful during the planning of multiple-st...