The paper presents a formal description of the resource allocation problem for resource-constrained project scheduling. A schedule can be executed by various resource flow networks which may differ in terms of resistance to disruptions occurring during project execution. The authors define such criteria of evaluating a resource flow network which can be more useful than robustness metrics used so far in the research. The authors discuss the importance of robust scheduling for execution projects and propose metrics for resource allocation robustness which take into consideration the stability of the final schedule. Those metrics make it possible to carry out a more precise analysis concerning the properties of the resource flow network in te...
The well-known deterministic resource-constrained project scheduling problem (RCPSP) involves the de...
In the past decades, the resource on the resource-constrained project scheduling problem (RCPSP) has...
Robust scheduling aims at the construction of a schedule that is protected against uncertain events....
The well-known deterministic resource-constrained project scheduling problem involves the determinat...
The vast majority of resource-constrained project scheduling efforts assumes complete information ab...
Robustness is essential for schedules if they are being executed under uncertain conditions. In this...
The majority of resource-constrained project scheduling efforts assume perfect information about the...
The majority of publications in the extensive literature on resource-constrained project scheduling ...
The majority of publications in the extensive literature on resource-constrained project scheduling ...
The well-known deterministic resource-constrained project scheduling problem (RCPSP) involves the de...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
The paper presents the resource-constrained project scheduling with cash flow optimisation. New proj...
The vast majority of resource-constrained project scheduling efforts assumes complete information ab...
The well-known deterministic resource-constrained project scheduling problem (RCPSP) involves the de...
In the past decades, the resource on the resource-constrained project scheduling problem (RCPSP) has...
Robust scheduling aims at the construction of a schedule that is protected against uncertain events....
The well-known deterministic resource-constrained project scheduling problem involves the determinat...
The vast majority of resource-constrained project scheduling efforts assumes complete information ab...
Robustness is essential for schedules if they are being executed under uncertain conditions. In this...
The majority of resource-constrained project scheduling efforts assume perfect information about the...
The majority of publications in the extensive literature on resource-constrained project scheduling ...
The majority of publications in the extensive literature on resource-constrained project scheduling ...
The well-known deterministic resource-constrained project scheduling problem (RCPSP) involves the de...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
The paper presents the resource-constrained project scheduling with cash flow optimisation. New proj...
The vast majority of resource-constrained project scheduling efforts assumes complete information ab...
The well-known deterministic resource-constrained project scheduling problem (RCPSP) involves the de...
In the past decades, the resource on the resource-constrained project scheduling problem (RCPSP) has...
Robust scheduling aims at the construction of a schedule that is protected against uncertain events....