Construction planning requires domain know-how, which is often ingrained with experienced construction planners through exposure to multiple projects over decades of work experience. Without explicit in-depth prior knowledge of the underlying processes, planning experts learn to form empirical associations between project problems and potential solutions. Almost in all situations, their experience is described through examples from previous projects as opposed to structured and principled knowledge. Given the lack of formal definitions and structured knowledge, transferring expert human planners' comprehensive knowledge to automated planning systems proves to be complex. And, while substantial research is conducted and many automated planni...
Construction projects are subject to diverse and complex challenges. However, most construction sche...
Poor planning on the construction site at the ‘look-ahead’ planning stage (where information from di...
One vital task of a project\u27s owner is to determine a reliable and reasonable construction time f...
Schedule generation is a vital construction planning tool which is founded on experiential knowledge...
This research attempts to model and prototype a knowledge-based system for use in the construction i...
232 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1988.A deeper understanding is nee...
Construction schedules are frequently criticised for inaccuracy and poor project performance, includ...
Even for the most well-intentioned companies, the commitment required for the initial drafting of a...
Construction scheduling essentially entails the generation of a 'map' of operations of how the proje...
Construction project life-cycle processes must be managed in a more effective and predictable way to...
Construction schedule analysis is a very broad and complex problem in that it requires a variety of ...
The Last PlannerTM System (LPS) has been implemented on construction projects to increase work flow ...
Construction planning and scheduling are important to contractors for estimating the cost and durati...
Scheduling in construction is complex. Before an activity can be conducted, a number of precondition...
Construction schedules are the timetables showing the planned start and finish dates for activities ...
Construction projects are subject to diverse and complex challenges. However, most construction sche...
Poor planning on the construction site at the ‘look-ahead’ planning stage (where information from di...
One vital task of a project\u27s owner is to determine a reliable and reasonable construction time f...
Schedule generation is a vital construction planning tool which is founded on experiential knowledge...
This research attempts to model and prototype a knowledge-based system for use in the construction i...
232 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1988.A deeper understanding is nee...
Construction schedules are frequently criticised for inaccuracy and poor project performance, includ...
Even for the most well-intentioned companies, the commitment required for the initial drafting of a...
Construction scheduling essentially entails the generation of a 'map' of operations of how the proje...
Construction project life-cycle processes must be managed in a more effective and predictable way to...
Construction schedule analysis is a very broad and complex problem in that it requires a variety of ...
The Last PlannerTM System (LPS) has been implemented on construction projects to increase work flow ...
Construction planning and scheduling are important to contractors for estimating the cost and durati...
Scheduling in construction is complex. Before an activity can be conducted, a number of precondition...
Construction schedules are the timetables showing the planned start and finish dates for activities ...
Construction projects are subject to diverse and complex challenges. However, most construction sche...
Poor planning on the construction site at the ‘look-ahead’ planning stage (where information from di...
One vital task of a project\u27s owner is to determine a reliable and reasonable construction time f...