A heuristic procedure is developed for minimizing makespan in flow-shop scheduling problems. In comparison with current algorithms, our algorithm seems to result in an improved makespan with a small additional computational effort. An algorithm is also developed to minimize the required number of pallets for a given makespan
this paper minimizes the makespan, i. e. the maximum completion time required to process all jobs. A...
This paper explores selected heuristics methods, namely CDS, Palmer’s slope index, Gupta’s algorithm...
The Wait Between Machines Flow-shop n:m: F:W BM and its permutation variant n: m:P:W BM are defined ...
We consider the problem of scheduling n jobs in a pallet-constrained flowshop so as to minimize the ...
Scheduling ‘n’ jobs on ‘m’ machines in a flow shop is NP- hard problem and places itself at prominen...
textabstractStudies the minimization in flowshops with pallet requirements. Importance of pallets in...
This paper presents a new heuristic for solving the flowshop scheduling problem that aims to minimiz...
This paper presents a new heuristic for solving the flowshop scheduling problem that aims to minimiz...
Programme 5 : traitement du signal, automatique et productiqueAvailable at INIST (FR), Document Supp...
In modern manufacturing the trend is the development of Computer Integrated Manufacturing, CIM techn...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
Les travaux présentés dans cette thèse abordent la minimisation de coûts de production dans uneindus...
Article dans revue scientifique avec comité de lecture. internationale.International audienceThis pa...
Balancing trade-offs between production cost and holding cost is critical for production and operati...
This paper presents an algorithm used to solve a carton to pallet packing problem in a drink manufac...
this paper minimizes the makespan, i. e. the maximum completion time required to process all jobs. A...
This paper explores selected heuristics methods, namely CDS, Palmer’s slope index, Gupta’s algorithm...
The Wait Between Machines Flow-shop n:m: F:W BM and its permutation variant n: m:P:W BM are defined ...
We consider the problem of scheduling n jobs in a pallet-constrained flowshop so as to minimize the ...
Scheduling ‘n’ jobs on ‘m’ machines in a flow shop is NP- hard problem and places itself at prominen...
textabstractStudies the minimization in flowshops with pallet requirements. Importance of pallets in...
This paper presents a new heuristic for solving the flowshop scheduling problem that aims to minimiz...
This paper presents a new heuristic for solving the flowshop scheduling problem that aims to minimiz...
Programme 5 : traitement du signal, automatique et productiqueAvailable at INIST (FR), Document Supp...
In modern manufacturing the trend is the development of Computer Integrated Manufacturing, CIM techn...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
Les travaux présentés dans cette thèse abordent la minimisation de coûts de production dans uneindus...
Article dans revue scientifique avec comité de lecture. internationale.International audienceThis pa...
Balancing trade-offs between production cost and holding cost is critical for production and operati...
This paper presents an algorithm used to solve a carton to pallet packing problem in a drink manufac...
this paper minimizes the makespan, i. e. the maximum completion time required to process all jobs. A...
This paper explores selected heuristics methods, namely CDS, Palmer’s slope index, Gupta’s algorithm...
The Wait Between Machines Flow-shop n:m: F:W BM and its permutation variant n: m:P:W BM are defined ...