This session will review the requirements for documents that must be submitted at the Ready For Contract (RFC) stage in the project development cycle. Topics will include FHWA submittal requirements for final approval of the Federal matching project funds, documents required to compile the Contract information Book and an overview of the contract letting process
OS7000 Zeutschel, 400 dpi, 8 bit, 15,854,980 bytesNo rivet hole shall exceed diameter of rivet by mo...
Concrete slabs in multi-level commercial building projects contain many components that become no lo...
BDV29-977-52For various reasons, including limitations in shipping and operation, as well as unfores...
PDFBriefBDU79Piles (Supports)Precast concreteSplicingStructural connectionBending stressPosttensioni...
PDFTech ReportBDU79Piles (Supports)Precast concreteSplicingStructural connectionBending stressPostte...
PDFTech Report17384Wooden bridgesPiles (Supports)SplicingHighway bridgesOregonOregon. Dept. of Trans...
FHWA is moving to new requirements for project close-out, which is presented in this session
Plan BThe definition and integration of universal provisions for new standard bid items in WisDOT St...
Synopsis: Concrete-filled fiber-reinforced polymer (FRP) tubes (CFFTs) are becoming increasingly po...
This session is intended for designers and construction personnel. We will discuss updates in policy...
Precast prestressed concrete piles are widely used in deep foundation construction. Due to unexpecte...
This session is a survey of the different hydraulic considerations in pipelining culverts covering t...
Rotary driven pipe piles are a unique solution for foundation construction in constrained urban area...
2007PDFTech Reporthttp://www.fhwa.dot.gov/engineering/geotech/pubs/gec8/gec8.pdfFHWA-HIF-07-03Piles ...
The Iowa Department of Transportation (DOT) rating engineer is sometimes asked by field personnel to...
OS7000 Zeutschel, 400 dpi, 8 bit, 15,854,980 bytesNo rivet hole shall exceed diameter of rivet by mo...
Concrete slabs in multi-level commercial building projects contain many components that become no lo...
BDV29-977-52For various reasons, including limitations in shipping and operation, as well as unfores...
PDFBriefBDU79Piles (Supports)Precast concreteSplicingStructural connectionBending stressPosttensioni...
PDFTech ReportBDU79Piles (Supports)Precast concreteSplicingStructural connectionBending stressPostte...
PDFTech Report17384Wooden bridgesPiles (Supports)SplicingHighway bridgesOregonOregon. Dept. of Trans...
FHWA is moving to new requirements for project close-out, which is presented in this session
Plan BThe definition and integration of universal provisions for new standard bid items in WisDOT St...
Synopsis: Concrete-filled fiber-reinforced polymer (FRP) tubes (CFFTs) are becoming increasingly po...
This session is intended for designers and construction personnel. We will discuss updates in policy...
Precast prestressed concrete piles are widely used in deep foundation construction. Due to unexpecte...
This session is a survey of the different hydraulic considerations in pipelining culverts covering t...
Rotary driven pipe piles are a unique solution for foundation construction in constrained urban area...
2007PDFTech Reporthttp://www.fhwa.dot.gov/engineering/geotech/pubs/gec8/gec8.pdfFHWA-HIF-07-03Piles ...
The Iowa Department of Transportation (DOT) rating engineer is sometimes asked by field personnel to...
OS7000 Zeutschel, 400 dpi, 8 bit, 15,854,980 bytesNo rivet hole shall exceed diameter of rivet by mo...
Concrete slabs in multi-level commercial building projects contain many components that become no lo...
BDV29-977-52For various reasons, including limitations in shipping and operation, as well as unfores...