Peak cooling loads for buildings during critical demand periods can be reduced significantly using heat capacity in building materials by lowering thermostat settings prior to the critical period and then adjusting setpoints upward in an optimal way between the beginning and end of the critical period. In this study, four methods for determining building-specific demand-limiting control are developed. One of them, termed a model-based method, uses a detailed inverse building model that is trained using several days of hourly data and requires a non-linear numerical scheme for determining the optimal setpoint trajectory that minimizes peak cooling load. Two other methods, termed the semi-analytical (SA) method and exponential setpoint equati...
The potential for utilizing building thermal mass for load shifting and peak demand reduction has be...
This paper presents general guidelines for the required cooling capacity of an entire office buildin...
This report addresses two issues related to the cooling and heating system in Sutardja Dai Hall. Fir...
Most commercial buildings have been dedicated HVAC systems to meet their comfort needs. ...
Building thermal mass can be used to reduce the peak cooling load. For example, in summer, the build...
This paper presents the evaluation of three different methods for determining zone temperature setpo...
Rapidly increasing requirements placed on utilities to reduce peak loads has led to utility customer...
The objective of this study was to demonstrate the potential for reducing peak-period electrical dem...
This report presents results from field testing and comfort surveys designed to evaluate peak demand...
The principle of pre-cooling and demand limiting is to pre-cool buildings at night or in the morning...
Peak demand cost usually contributes a considerable amount to the monthly electricity bills of comme...
Previous field studies demonstrated the effectiveness of demand response (DR) control strategies to ...
With the rapidly increasing demands placed on utilities, reducing peak loads and minimizing energy u...
In the changing electricity power supply chain, demand response from buildings is a crucial control ...
This research project is funded by the American Society of Heating, Refrigerating and Air-Conditioni...
The potential for utilizing building thermal mass for load shifting and peak demand reduction has be...
This paper presents general guidelines for the required cooling capacity of an entire office buildin...
This report addresses two issues related to the cooling and heating system in Sutardja Dai Hall. Fir...
Most commercial buildings have been dedicated HVAC systems to meet their comfort needs. ...
Building thermal mass can be used to reduce the peak cooling load. For example, in summer, the build...
This paper presents the evaluation of three different methods for determining zone temperature setpo...
Rapidly increasing requirements placed on utilities to reduce peak loads has led to utility customer...
The objective of this study was to demonstrate the potential for reducing peak-period electrical dem...
This report presents results from field testing and comfort surveys designed to evaluate peak demand...
The principle of pre-cooling and demand limiting is to pre-cool buildings at night or in the morning...
Peak demand cost usually contributes a considerable amount to the monthly electricity bills of comme...
Previous field studies demonstrated the effectiveness of demand response (DR) control strategies to ...
With the rapidly increasing demands placed on utilities, reducing peak loads and minimizing energy u...
In the changing electricity power supply chain, demand response from buildings is a crucial control ...
This research project is funded by the American Society of Heating, Refrigerating and Air-Conditioni...
The potential for utilizing building thermal mass for load shifting and peak demand reduction has be...
This paper presents general guidelines for the required cooling capacity of an entire office buildin...
This report addresses two issues related to the cooling and heating system in Sutardja Dai Hall. Fir...