International audienceMaintenance activities are necessary to maintain the functionality of the railway infrastructure. Commonly, the maintenance activities are planned first. Then, the timetable is elaborated respecting the unavailability periods caused by the former. However, unplanned maintenance activities may have to be introduced at short notice, and the timetable must be rearranged. In addition, specific trains may be necessary to perform maintenance activities, and they are typically not scheduled in the timetable. In this case, the timetable may need to be further modified to integrate the maintenance trains. In this paper, we propose a mixed integer linear programming formulation that modifies a timetable to cope with maintenance ...
We address the problem of simultaneously scheduling trains and maintenance time slots on a railway n...
We consider the Train Timetabling Problem (TTP) in a railway node (i.e. a set of stations in an urba...
This paper addresses the problem of improving the integration between passenger timetabling and trac...
ROADEF 2017, 18ème conférence de la Société française de Recherche Opérationnelle et d'Aide à la Déc...
7th International Conference on Railway Operations Modelling and Analysis - Rail Lille, Lille, Franc...
National audienceMaintenance Activities (MA's) are necessary to sustain the state and functionality ...
Increasing supply in railway networks comes at the cost of an increased need for infrastructure main...
EURO/ALIO 2018, International Conference on Applied Combinatorial Optimization, Bologne, ITALIE, 25-...
A significant growth of the railway transportation demand is forecasted in the next decades which ne...
On a daily basis, large-scale disruptions require infrastructure managers and railway operators to r...
On a daily basis, large-scale disruptions require infrastructure managers and railway operators to r...
With increase in the use of railway transport, ensuring robustness in railway timetables has never b...
During infrastructure maintenance possessions, commonly not all trains can operate, and the original...
The availability of railway networks is important for society and the economy. To keep the infrastru...
Most railway systems experience a growing demand of railway capacity. To face this demand, either ne...
We address the problem of simultaneously scheduling trains and maintenance time slots on a railway n...
We consider the Train Timetabling Problem (TTP) in a railway node (i.e. a set of stations in an urba...
This paper addresses the problem of improving the integration between passenger timetabling and trac...
ROADEF 2017, 18ème conférence de la Société française de Recherche Opérationnelle et d'Aide à la Déc...
7th International Conference on Railway Operations Modelling and Analysis - Rail Lille, Lille, Franc...
National audienceMaintenance Activities (MA's) are necessary to sustain the state and functionality ...
Increasing supply in railway networks comes at the cost of an increased need for infrastructure main...
EURO/ALIO 2018, International Conference on Applied Combinatorial Optimization, Bologne, ITALIE, 25-...
A significant growth of the railway transportation demand is forecasted in the next decades which ne...
On a daily basis, large-scale disruptions require infrastructure managers and railway operators to r...
On a daily basis, large-scale disruptions require infrastructure managers and railway operators to r...
With increase in the use of railway transport, ensuring robustness in railway timetables has never b...
During infrastructure maintenance possessions, commonly not all trains can operate, and the original...
The availability of railway networks is important for society and the economy. To keep the infrastru...
Most railway systems experience a growing demand of railway capacity. To face this demand, either ne...
We address the problem of simultaneously scheduling trains and maintenance time slots on a railway n...
We consider the Train Timetabling Problem (TTP) in a railway node (i.e. a set of stations in an urba...
This paper addresses the problem of improving the integration between passenger timetabling and trac...