Project duration is one of the critical features of a construction project which is determined by project planners during pre-tendering stages. Although there are several project forecasting techniques that are being practiced globally, in Sri Lanka it is the experience and practice that are used to determine the duration of a road rehabilitation project. Hence this research was aimed at developing criteria to determine the time of completion of road rehabilitation projects in Sri Lanka. Initially, a literature synthesis was carried out to identify project duration forecasting methods that are currently available and factors that can affect project durations. Subsequently, the extent of usage of those methods and factors, were determined th...
Road projects are experiencing huge delays in Sri Lanka due to utility relocation, delays in releasi...
Scheduling is the most critical aspect to be considered in construction planning. When the project i...
Purpose – Construction projects within Malaysia are plagued by time overruns that can transform what...
One of the most important problems in the construction industry is delays. Delays occur in every con...
Delays in construction projects are inevitable and they are the most critical factor that affects th...
The Appropriate Delay Analysis Techniques to Analyze the Delays in Road Construction Projects in Sr...
This study attempts to identify the delay causes factors affect to the delay of road construction pr...
Although, every planning and scheduling has been carried out perfectly and closely, this will not gu...
The delays in the construction projects are a global phenomenon and are considered as a standout amo...
The problem of schedule delay is a frequent and regular phenomenon in the construction projects. Ro...
The construction industry in Sri Lanka are being implemented various standards to complete the proje...
Construction Industry can be identified as the most important sector in Sri Lanka that drives the ec...
Client Delays in Infrastructure projects: A Case of Road Development Authority (RDA) The client del...
A comprehensive plan is required to anticipate risks in a construction project. In practice, however...
An increased number of disputes with regard to the additional times and payments in respect of the c...
Road projects are experiencing huge delays in Sri Lanka due to utility relocation, delays in releasi...
Scheduling is the most critical aspect to be considered in construction planning. When the project i...
Purpose – Construction projects within Malaysia are plagued by time overruns that can transform what...
One of the most important problems in the construction industry is delays. Delays occur in every con...
Delays in construction projects are inevitable and they are the most critical factor that affects th...
The Appropriate Delay Analysis Techniques to Analyze the Delays in Road Construction Projects in Sr...
This study attempts to identify the delay causes factors affect to the delay of road construction pr...
Although, every planning and scheduling has been carried out perfectly and closely, this will not gu...
The delays in the construction projects are a global phenomenon and are considered as a standout amo...
The problem of schedule delay is a frequent and regular phenomenon in the construction projects. Ro...
The construction industry in Sri Lanka are being implemented various standards to complete the proje...
Construction Industry can be identified as the most important sector in Sri Lanka that drives the ec...
Client Delays in Infrastructure projects: A Case of Road Development Authority (RDA) The client del...
A comprehensive plan is required to anticipate risks in a construction project. In practice, however...
An increased number of disputes with regard to the additional times and payments in respect of the c...
Road projects are experiencing huge delays in Sri Lanka due to utility relocation, delays in releasi...
Scheduling is the most critical aspect to be considered in construction planning. When the project i...
Purpose – Construction projects within Malaysia are plagued by time overruns that can transform what...