The majority of faults in the transmission network can be successfully cleared by the proper use of protective relays to trip the respective circuit breakers and to bring back the system to normalcy using high speed autoreclosing. Thus, autoreclosing can significantly reduce the outage time due to faults and provide a higher level of service continuity to the customer. Furthermore, successful high-speed reclosing on transmission circuits can be a major factor when attempting to maintain system stability during fault clearing. Initial studies revealed that a detailed study of Autoreclosing settings in the transmission network of Ceylon Electricity Board and their performance based on failure analysis has not been carried out since t...
Blackouts are been reported throughout the history worldwide and nowadays, a moment without electric...
Emergency load shedding for preventing frequency degradation is an established practice all over th...
The purpose of this study is to investigate the optimum deadtime for 275kV auto-recloser that improv...
Majority of the faults in power network are transient and these faults can be cleared with proper i...
Abstract: Majority of the faults in power network are transient and these faults can be cleared with...
In an era where Sri Lanka economy is going towards a drastically higher growth it is highly importa...
Majority of the faults in the transmission and distribution network are transient and these faults ...
Under frequency load shedding has been widely used to restore the power system frequency following ...
The Telecommunication industry in Sri Lanka is having very fast growing and expanding services to th...
In present-day power systems, an automatic reclosure function (F79) has been proposed in the manufac...
Improving reliability in power system is very important to the utilities as well as to the country a...
The power system Sri Lanka is an islanded power system of a relatively small size. Other than the c...
Under frequency load shedding has been widely used to restore the power system frequency following a...
A PhotocopyThis dissertation includes the individual project details/results, which has been comple...
Abstract: The National Energy Regulator of South Africa (NERSA) has implemented an Incentive- Based ...
Blackouts are been reported throughout the history worldwide and nowadays, a moment without electric...
Emergency load shedding for preventing frequency degradation is an established practice all over th...
The purpose of this study is to investigate the optimum deadtime for 275kV auto-recloser that improv...
Majority of the faults in power network are transient and these faults can be cleared with proper i...
Abstract: Majority of the faults in power network are transient and these faults can be cleared with...
In an era where Sri Lanka economy is going towards a drastically higher growth it is highly importa...
Majority of the faults in the transmission and distribution network are transient and these faults ...
Under frequency load shedding has been widely used to restore the power system frequency following ...
The Telecommunication industry in Sri Lanka is having very fast growing and expanding services to th...
In present-day power systems, an automatic reclosure function (F79) has been proposed in the manufac...
Improving reliability in power system is very important to the utilities as well as to the country a...
The power system Sri Lanka is an islanded power system of a relatively small size. Other than the c...
Under frequency load shedding has been widely used to restore the power system frequency following a...
A PhotocopyThis dissertation includes the individual project details/results, which has been comple...
Abstract: The National Energy Regulator of South Africa (NERSA) has implemented an Incentive- Based ...
Blackouts are been reported throughout the history worldwide and nowadays, a moment without electric...
Emergency load shedding for preventing frequency degradation is an established practice all over th...
The purpose of this study is to investigate the optimum deadtime for 275kV auto-recloser that improv...