Project schedule management involves the proper allocation of resources, such as manpower. Human resource allocation practices generally lack a systematic method that will allow project managers to provide simple and sustainable planning solutions. A new scheduling methodology is proposed in this work, which integrates Pinch Analysis (PA) with critical path method (CPM) given a fixed project duration. The CPM with resource smoothing is the commonly used project management tool that defines the series of critical activities and other activities with slack. Resource smoothing is made when the fluctuation of needed resources does not have large variations with respect to the duration. This scenario gives a practical resource histogram and redu...
In this paper, a practical method is developed in an attempt to address the fundamental matters and ...
Project scheduling problem with resources constraint is a well-known problem in the field of project...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
The newly developed pinch analysis technique for short-term, batch-process scheduling can be applied...
The purpose of this study is to investigate and analyze the relationships between project progress c...
Resource calendars specify nonworking days of driving resources involved in construction projects. A...
Project management has become a widespread instrument enabling organizations to efficiently master t...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
Abstract In practice, most projects result in cost overruns and schedule slippage due to poor resour...
Project scheduling is an important task in project management which monitors the project duration, r...
This paper is aimed at minimizing project time subject to the available resources using Critical Pat...
Abstract Project scheduling is concerned with an optimal allocation of resourcesto activities realiz...
The absence of a valid resource-constrained critical path method (CPM) not only hampers the widespre...
Scheduling of a construction project can be done by using the Critical Path Method (CPM) in case the...
Integration of repetitive and non-repetitive scheduling methods utilizes the merits and unique featu...
In this paper, a practical method is developed in an attempt to address the fundamental matters and ...
Project scheduling problem with resources constraint is a well-known problem in the field of project...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
The newly developed pinch analysis technique for short-term, batch-process scheduling can be applied...
The purpose of this study is to investigate and analyze the relationships between project progress c...
Resource calendars specify nonworking days of driving resources involved in construction projects. A...
Project management has become a widespread instrument enabling organizations to efficiently master t...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
Abstract In practice, most projects result in cost overruns and schedule slippage due to poor resour...
Project scheduling is an important task in project management which monitors the project duration, r...
This paper is aimed at minimizing project time subject to the available resources using Critical Pat...
Abstract Project scheduling is concerned with an optimal allocation of resourcesto activities realiz...
The absence of a valid resource-constrained critical path method (CPM) not only hampers the widespre...
Scheduling of a construction project can be done by using the Critical Path Method (CPM) in case the...
Integration of repetitive and non-repetitive scheduling methods utilizes the merits and unique featu...
In this paper, a practical method is developed in an attempt to address the fundamental matters and ...
Project scheduling problem with resources constraint is a well-known problem in the field of project...
This paper analyses the current state of research regarding solution methods dealing with resource-c...