Currently, the construction of slope is increasing; thus, the risk of slope to fail also increases. The series of landslide that happened to man-made slope has been recorded since the early of 1993 until now. Many efforts such as treating the critical slope, redesigning the failed slope, and analysing the stability of the slope have been done. However, landslide is still happening in Malaysia. The factor of safety (FOS) from the stability analysis that is commonly used might not be adequate to determine the safety of the slope in Malaysia. Therefore, in this study, the optimum factor of safety was obtained by using three methods of slice; Bishop’s Simplified method, Spencer method, and Morgenstern-Price method which have been us...