The oil and gas sector involved a plethora of professionals and processing requirements across the lifecycle of its product. In Engineering, Procurement and Construction (EPC) contract, the contractor has to deal with the owner and a large number of sub-entities. Due to that, many issues have arisen among the stakeholders in the EPC project and it leads to a delay in completion and budget overrun. A literature search indicated issues in the EPC contract that happened in other countries. However, there is a limitation of literature that highlights the issues of the EPC contract from the Malaysian context. This somehow hinders the effort to improve the issues of EPC contracting strategies in Malaysia. Hence, this research aims to identify the...
Development of Liquefied Natural Gas (LNG) projects in Indonesia mostly utilized Engineering Procure...
During the period of high oil and gas prices in the late 70’s and early 80’s, the operators (Petrona...
Delay in project is a universal phenomenon and the effects of the delay can affect all involved stak...
The megaproject in Downstream Sector of Oil and Gas Industry only achieve 50% success rate which war...
AbstractEngineering, procurement and construction (EPC) contracts are on the way to become the most ...
Procurement system in construction industry can be categorized into several methods. One of them is ...
This study is the continuation of a few research studies that have been carried out in Iran and othe...
The drop-in oil price in recent years has seen the oil and gas projects affected negatively. Thus, m...
Billion-dollar investments are quite common in oil and gas industry and owners generally prefer engi...
Project development and marketing on large oil and gas projects (LOGPs) by engineering-procurement-c...
Oil and gas projects are risky undertakings, which may cause severe damage to property and the envir...
This research attempts to study the major project management issues in the oil and gas industry. The...
The research has successfully bridged the gap between contractual and technological practices for th...
Large Engineering and Construction Projects (LECPs) form an important area of economic activity, cov...
Procurement is a strategy to satisfy the client?s needs. Basically, clients in the construction indu...
Development of Liquefied Natural Gas (LNG) projects in Indonesia mostly utilized Engineering Procure...
During the period of high oil and gas prices in the late 70’s and early 80’s, the operators (Petrona...
Delay in project is a universal phenomenon and the effects of the delay can affect all involved stak...
The megaproject in Downstream Sector of Oil and Gas Industry only achieve 50% success rate which war...
AbstractEngineering, procurement and construction (EPC) contracts are on the way to become the most ...
Procurement system in construction industry can be categorized into several methods. One of them is ...
This study is the continuation of a few research studies that have been carried out in Iran and othe...
The drop-in oil price in recent years has seen the oil and gas projects affected negatively. Thus, m...
Billion-dollar investments are quite common in oil and gas industry and owners generally prefer engi...
Project development and marketing on large oil and gas projects (LOGPs) by engineering-procurement-c...
Oil and gas projects are risky undertakings, which may cause severe damage to property and the envir...
This research attempts to study the major project management issues in the oil and gas industry. The...
The research has successfully bridged the gap between contractual and technological practices for th...
Large Engineering and Construction Projects (LECPs) form an important area of economic activity, cov...
Procurement is a strategy to satisfy the client?s needs. Basically, clients in the construction indu...
Development of Liquefied Natural Gas (LNG) projects in Indonesia mostly utilized Engineering Procure...
During the period of high oil and gas prices in the late 70’s and early 80’s, the operators (Petrona...
Delay in project is a universal phenomenon and the effects of the delay can affect all involved stak...