10.1109/ICPADS.2007.4447753Proceedings of the International Conference on Parallel and Distributed Systems - ICPADS1-PIPS
Abstract: This paper develops a matching and scheduling algorithm that accounts for both the executi...
Reducing the energy consumption of multiprocessor real-time embedded systems is a growing concern to...
Abstract—In designing energy-aware CPU scheduling algo-rithms for real-time embedded systems, dynami...
International audienceEnergy consumption is an important concern when designing embedded systems. St...
Advances in computing and networking technologies are making large scale distributed heterogeneous c...
cited By 5; Conference of 21st International Conference on Real-Time Networks and Systems, RTNS 2013...
10.1109/TPDS.2008.55IEEE Transactions on Parallel and Distributed Systems2011-12ITDS
Réduire la consommation énergétique des systèmes temps réel embarqués multiprocesseurs est devenu un...
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and ...
[[abstract]]Power-aware systems are those that must make the best use of available power. They subsu...
In this paper, we present a dynamic scheduling algorithm to minimize the energy consumption by both ...
For the past several decades, we have experienced the tremendous growth, in both scale and scope, of...
Preemption threshold scheduling (PTS) enables designing scalable real-time systems. PTS not only dec...
Multi-core processors increasingly appear as an enabling platform for embedded systems, e.g., mobile...
With the advanced technology used to design VLSI (Very Large Scale Integration) circuits, low-power ...
Abstract: This paper develops a matching and scheduling algorithm that accounts for both the executi...
Reducing the energy consumption of multiprocessor real-time embedded systems is a growing concern to...
Abstract—In designing energy-aware CPU scheduling algo-rithms for real-time embedded systems, dynami...
International audienceEnergy consumption is an important concern when designing embedded systems. St...
Advances in computing and networking technologies are making large scale distributed heterogeneous c...
cited By 5; Conference of 21st International Conference on Real-Time Networks and Systems, RTNS 2013...
10.1109/TPDS.2008.55IEEE Transactions on Parallel and Distributed Systems2011-12ITDS
Réduire la consommation énergétique des systèmes temps réel embarqués multiprocesseurs est devenu un...
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and ...
[[abstract]]Power-aware systems are those that must make the best use of available power. They subsu...
In this paper, we present a dynamic scheduling algorithm to minimize the energy consumption by both ...
For the past several decades, we have experienced the tremendous growth, in both scale and scope, of...
Preemption threshold scheduling (PTS) enables designing scalable real-time systems. PTS not only dec...
Multi-core processors increasingly appear as an enabling platform for embedded systems, e.g., mobile...
With the advanced technology used to design VLSI (Very Large Scale Integration) circuits, low-power ...
Abstract: This paper develops a matching and scheduling algorithm that accounts for both the executi...
Reducing the energy consumption of multiprocessor real-time embedded systems is a growing concern to...
Abstract—In designing energy-aware CPU scheduling algo-rithms for real-time embedded systems, dynami...