Loading ships as they are unloaded (double-cycling) can improve the efficiency of a quay crane and thus container port. This paper describes the double-cycling problem, and presents two solution algorithms and simple formulae to estimate reductions in the number of operations, and operating time. The problem is formulated as a scheduling problem. Small problems can be solved to optimality with a standard numerical solver, but problems of typical size are computationally burdensome and terminated after 10 hours with optimality gaps larger than 50%. A formula for an improved lower bound to the optimal solution is developed and shows the optimality gaps are actually below 2.5% in all cases. The paper presents a greedy algorithm that can...
Maritime terminals of pure transhipment are emerging lo-gistic realities in long-distance containeri...
ABSTRACT The growth of global trade transiting over the ocean has been continually increasing. A ne...
In a container terminal, the quay cranes (QCs) are the main equipment involved in the core activitie...
Loading ships as they are unloaded (double cycling) can improve the efficiency of a quay crane and c...
Loading ships as they are unloaded (double-cycling) can improve the efficiency of a quay crane and c...
Double cycling improves efficiency by unloading and loading a ship simultaneously; using wasted cran...
<div><p>Double cycling is an efficient tool to increase the efficiency of quay crane (QC) in contain...
Double cycling is an efficient tool to increase the efficiency of quay crane (QC) in container termi...
This report compares the performance of three double-cycling algorithms used to determine the sequen...
International audienceOne of great challenges in seaport management is how to handle containers unde...
This paper introduces a novel quay crane design, double girder bridge crane (DGBC). DGBC is capable ...
Increasing international maritime transport drives the need for efficient container terminals. The s...
The scheduling of quay cranes (QCs) to minimize the handling time of a berthed vessel is one of the ...
In this report, a heuristic quay crane scheduling algorithm is designed to tackle the problem of det...
Automated container terminals have been constructed to reduce emissions and labor cost. Resource all...
Maritime terminals of pure transhipment are emerging lo-gistic realities in long-distance containeri...
ABSTRACT The growth of global trade transiting over the ocean has been continually increasing. A ne...
In a container terminal, the quay cranes (QCs) are the main equipment involved in the core activitie...
Loading ships as they are unloaded (double cycling) can improve the efficiency of a quay crane and c...
Loading ships as they are unloaded (double-cycling) can improve the efficiency of a quay crane and c...
Double cycling improves efficiency by unloading and loading a ship simultaneously; using wasted cran...
<div><p>Double cycling is an efficient tool to increase the efficiency of quay crane (QC) in contain...
Double cycling is an efficient tool to increase the efficiency of quay crane (QC) in container termi...
This report compares the performance of three double-cycling algorithms used to determine the sequen...
International audienceOne of great challenges in seaport management is how to handle containers unde...
This paper introduces a novel quay crane design, double girder bridge crane (DGBC). DGBC is capable ...
Increasing international maritime transport drives the need for efficient container terminals. The s...
The scheduling of quay cranes (QCs) to minimize the handling time of a berthed vessel is one of the ...
In this report, a heuristic quay crane scheduling algorithm is designed to tackle the problem of det...
Automated container terminals have been constructed to reduce emissions and labor cost. Resource all...
Maritime terminals of pure transhipment are emerging lo-gistic realities in long-distance containeri...
ABSTRACT The growth of global trade transiting over the ocean has been continually increasing. A ne...
In a container terminal, the quay cranes (QCs) are the main equipment involved in the core activitie...