In the period 2012 to 2014 Caltrans designed and built three long-life asphalt pavement (LLAP) rehabilitation projects. Two were in District 2 on Interstate 5 and one was in District 4 on Interstate 80. This technical memorandum describes the processes that were followed to develop the performance criteria for a pavement section to be designed and constructed as a long-life asphalt pavement (LLAP) section on Interstate 5 through and north of Weed, California. Appropriate layers of the structural pavement included 25 percent reclaimed asphalt (RAP), based on the availability of this material. Two designs were included in the development process. The planned structural pavement design included the following two hot mix asphalt mixes: An HMA s...
97 p.This project focused on the characterization of materials used to construct the Hot Mix Asphalt...
794685078Final report; 11/01/2010-11/25/2011.PDFTech ReportFHWA-PA-2011-013-PSU 032LTI 2012-02510602...
PDFTech ReportFHWA/LA.09/453LTRC Project Number: 04-4BState Project Number: 736-99-1449Aggregate gra...
In the period 2012 to 2014 Caltrans designed and built three long-life asphalt pavement (LLAP) rehab...
In the period 2012 to 2014, Caltrans designed and built three long-life asphalt pavement (LLAP) reha...
In the period 2012 to 2014 Caltrans designed and built three long-life asphalt pavement (LLAP) rehab...
PDFTech ReportCDOT-2014-10Hot mix paving mixturesSuperpaveRehabilitation (Maintenance)Mix designLife...
This study focused on the assessment of long-term performance of asphalt pavements containing warm m...
PDFTech ReportIHRB Project TR-635InTrans Project 11-406Warm mix paving mixturesPavement performanceC...
The primary objective of this research is to identify the proper design guidelines in terms of stru...
PDFTech ReportAsphalt pavementsAging (Materials)Asphalt concreteMix designViscosityPavement designFi...
A number of warm-mix asphalt test sections were constructed in California between 2007 and 2010 to a...
PDFTech ReportWA-RD 860.1Agreement T1462, Task 02Asphalt pavementsService lifeHot mix paving mixture...
PDFTech ReportCT-2250-1-08-11SPR-2250Hot mix paving mixturesMix designPavement performanceLaboratory...
This study analyzes the performance of three common hot mix asphalt rehabilitation strategies on 149...
97 p.This project focused on the characterization of materials used to construct the Hot Mix Asphalt...
794685078Final report; 11/01/2010-11/25/2011.PDFTech ReportFHWA-PA-2011-013-PSU 032LTI 2012-02510602...
PDFTech ReportFHWA/LA.09/453LTRC Project Number: 04-4BState Project Number: 736-99-1449Aggregate gra...
In the period 2012 to 2014 Caltrans designed and built three long-life asphalt pavement (LLAP) rehab...
In the period 2012 to 2014, Caltrans designed and built three long-life asphalt pavement (LLAP) reha...
In the period 2012 to 2014 Caltrans designed and built three long-life asphalt pavement (LLAP) rehab...
PDFTech ReportCDOT-2014-10Hot mix paving mixturesSuperpaveRehabilitation (Maintenance)Mix designLife...
This study focused on the assessment of long-term performance of asphalt pavements containing warm m...
PDFTech ReportIHRB Project TR-635InTrans Project 11-406Warm mix paving mixturesPavement performanceC...
The primary objective of this research is to identify the proper design guidelines in terms of stru...
PDFTech ReportAsphalt pavementsAging (Materials)Asphalt concreteMix designViscosityPavement designFi...
A number of warm-mix asphalt test sections were constructed in California between 2007 and 2010 to a...
PDFTech ReportWA-RD 860.1Agreement T1462, Task 02Asphalt pavementsService lifeHot mix paving mixture...
PDFTech ReportCT-2250-1-08-11SPR-2250Hot mix paving mixturesMix designPavement performanceLaboratory...
This study analyzes the performance of three common hot mix asphalt rehabilitation strategies on 149...
97 p.This project focused on the characterization of materials used to construct the Hot Mix Asphalt...
794685078Final report; 11/01/2010-11/25/2011.PDFTech ReportFHWA-PA-2011-013-PSU 032LTI 2012-02510602...
PDFTech ReportFHWA/LA.09/453LTRC Project Number: 04-4BState Project Number: 736-99-1449Aggregate gra...