The central drift chamber for the BaBar detector at the SLAC B-factory is based on a hexagonal cell design with 7104 cells arranged in 40 layers and drift gas Helium:isobutane (80%:20%). Performance optimization and integration requirements led to an electronics design that mounts the amplifier-discriminator and digitizing circuitry directly on the endplate. High channel density is achieved using a 4-channel custom amplifier-discriminator IC and an 8-channel custom CMOS TDC/FADC IC on a single circuit board. Data read from the front ends are multiplexed on 4 fiber optic links, and prompt trigger data are sent out continuously on 24 links. Analysis of cosmic ray data demonstrates that the electronics design meets the performance goals for th...
A TDC board has been designed and built to complete the readout of the Instrumented Flux Return of t...
In 2004, the first two sextants of the new Limited Streamer Tube (LST) detector were installed in th...
The detector of Internally Reflected Cherenkov light (DIRC) of the BaBar detector (SLAC Stanford, US...
The central drift chamber for the BaBar detector at the SLAG B-factory is based on a hexagonal cell ...
The central drift chamber for the BaBar detector at the PEP-II B-factory at SLAC is a cylindrical ch...
The central drift chamber for the BaBar detector at the PEP-II B-factory at SLAC is a cylindrical ch...
The BABAR experiment has been operating at SLAC's PEP-II asymmetric B-Factory since 1999. The accele...
The BaBar Drift Chamber is now under construction. We review its design, the progress in the constru...
The BaBar Drift Chamber is now under construction. We review its design, the progress in the constru...
BABAR, the detector for the SLAC PEP-II asymmetric e+e− B Factory operating at the ϒ(4S) resonance, ...
BABAR, the detector for the SLAC PEP-II asymmetric e+e- B Factory operating at the γ(4S) resonance, ...
BABAR, the detector for the SLAC PEP-II asymmetric e+e- B Factory operating at the upsilon 4S resona...
A TDC board has been designed and built to complete the readout of the Instrumented Flux Return of t...
In 2004, the first two sextants of the new Limited Streamer Tube (LST) detector were installed in th...
The detector of Internally Reflected Cherenkov light (DIRC) of the BaBar detector (SLAC Stanford, US...
The central drift chamber for the BaBar detector at the SLAG B-factory is based on a hexagonal cell ...
The central drift chamber for the BaBar detector at the PEP-II B-factory at SLAC is a cylindrical ch...
The central drift chamber for the BaBar detector at the PEP-II B-factory at SLAC is a cylindrical ch...
The BABAR experiment has been operating at SLAC's PEP-II asymmetric B-Factory since 1999. The accele...
The BaBar Drift Chamber is now under construction. We review its design, the progress in the constru...
The BaBar Drift Chamber is now under construction. We review its design, the progress in the constru...
BABAR, the detector for the SLAC PEP-II asymmetric e+e− B Factory operating at the ϒ(4S) resonance, ...
BABAR, the detector for the SLAC PEP-II asymmetric e+e- B Factory operating at the γ(4S) resonance, ...
BABAR, the detector for the SLAC PEP-II asymmetric e+e- B Factory operating at the upsilon 4S resona...
A TDC board has been designed and built to complete the readout of the Instrumented Flux Return of t...
In 2004, the first two sextants of the new Limited Streamer Tube (LST) detector were installed in th...
The detector of Internally Reflected Cherenkov light (DIRC) of the BaBar detector (SLAC Stanford, US...