Nitrogen mineralization and nitrate leaching were investigated in an acid mine soil reclaimed with sewage sludge (SS) and coal combustion residues (CCR). In the field experiments mine soil was amended with three rates of SS (0, 1200, and 2400 kg N ha{dollar}\\sp{lcub}-1{rcub}){dollar} and two types of CCR, i.e. fly ash (FA) and fluidized bed waste (FBW) applied at rates equivalent to once and twice the lime requirement of the soil. Laboratory incubation experiments using two procedures (leached and nonleached) were also conducted for 46 weeks to investigate N mineralization in an acid mine soil with or without liming agents (agricultural lime and FBW), and in two fly ashes (one alkaline and the other near neutral) used as top soil substitut...
Nitrogen transformations occuring in urea-fertilized soils during nitrification were studied in labo...
Presentation was given at the 2010 National Meeting of the American Society of Mining and Reclamatio...
Piggery pond sludge (PPS) was applied, as-collected (Wet PPS) and following stockpiling for 12 month...
Rehabilitating coal gasification ash dumps by amendment with waste-activated sludge has been shown ...
Coal gasification ash (CGA) is the waste by-product of the process of producing synthetic fuel from ...
Organic wastes were used to increase N fertility at a surface mine reclamation site, with the ultima...
Applying sewage sludge to mine tailings to encourage growth of vegetation in order to prevent enviro...
Two environmental problems in Pennsylvania are degraded mined lands and excess manure nutrients from...
Abstract: Investigations were performed on soils of different acidity, ranging in the pH interval 4....
Piggery pond sludge (PPS) was applied, as-collected (Wet PPS) and following stockpiling for 12 month...
Piggery pond sludge ( PPS) was applied, as-collected ( Wet PPS) and following stockpiling for 12 mon...
Piggery pond sludge (PPS) was applied, as-collected (Wet PPS) and following stockpiling for 12 month...
Incubation studies were carried out to investigate the release of nitrogen in soils. The domestic se...
The work of this thesis is concerned with the study of some aspects of nitrogen cycling in coal mine...
Abandoned mine sites associated with coal and metal mining across the western United States have bee...
Nitrogen transformations occuring in urea-fertilized soils during nitrification were studied in labo...
Presentation was given at the 2010 National Meeting of the American Society of Mining and Reclamatio...
Piggery pond sludge (PPS) was applied, as-collected (Wet PPS) and following stockpiling for 12 month...
Rehabilitating coal gasification ash dumps by amendment with waste-activated sludge has been shown ...
Coal gasification ash (CGA) is the waste by-product of the process of producing synthetic fuel from ...
Organic wastes were used to increase N fertility at a surface mine reclamation site, with the ultima...
Applying sewage sludge to mine tailings to encourage growth of vegetation in order to prevent enviro...
Two environmental problems in Pennsylvania are degraded mined lands and excess manure nutrients from...
Abstract: Investigations were performed on soils of different acidity, ranging in the pH interval 4....
Piggery pond sludge (PPS) was applied, as-collected (Wet PPS) and following stockpiling for 12 month...
Piggery pond sludge ( PPS) was applied, as-collected ( Wet PPS) and following stockpiling for 12 mon...
Piggery pond sludge (PPS) was applied, as-collected (Wet PPS) and following stockpiling for 12 month...
Incubation studies were carried out to investigate the release of nitrogen in soils. The domestic se...
The work of this thesis is concerned with the study of some aspects of nitrogen cycling in coal mine...
Abandoned mine sites associated with coal and metal mining across the western United States have bee...
Nitrogen transformations occuring in urea-fertilized soils during nitrification were studied in labo...
Presentation was given at the 2010 National Meeting of the American Society of Mining and Reclamatio...
Piggery pond sludge (PPS) was applied, as-collected (Wet PPS) and following stockpiling for 12 month...