Introduction; PETRA IV project at DESY; BPM system for PETRA IV; long term stability measurement at PETRA III; long term stability investigations at I-Tec
Abstract The ESS Linac will include in total more than 140 Beam Position Monitors of different sizes...
Development of the beam diagnostics system for the J-PARC Rapid-Cycling Synchrotron is described. Th
At DESY, developments towards the fourth-generation synchrotron light source PETRA IV are ongoing in...
Petra IV BPM System, Status and Development: Introduction, Tests at Petra 3, BPM System for PETRA IV...
- Introduction- Overview and Particularities of PETRA IV- Beam Position Monitors- Test Measurements ...
Within the PETRA IV project at DESY, thesynchrotron radiation source PETRA III will be upgradedinto ...
In the scope of the TDR phase for the future PETRA IV low-emittance ring upgrade project, special at...
PETRA IV at DESY will be an upgrade of the present synchrotron radiation source PETRA III into an ul...
There is a large range of bandwidth needed for the BPM electronic for the Petrapreaccelerators. The ...
For the new PETRA IV project at DESY, about 800 high resolution BPMs will be installed with the read...
In order to measure the noise level of a BPM system from beam generated orbit data, the correlated b...
For the planned upgrade of synchrotron radiation sources PETRA (called PETRA IV) at DESY a much high...
At DESY, an upgrade of the PETRA III synchrotron light source towards a fourth-generation, low emit-...
A series of Beam Position Monitors (BPMs) will be installed at the Front End Test Stand (FETS) at RA...
At DESY it is planned to convert the PETRA ring into a synchrotron radiation facility, called PETRA ...
Abstract The ESS Linac will include in total more than 140 Beam Position Monitors of different sizes...
Development of the beam diagnostics system for the J-PARC Rapid-Cycling Synchrotron is described. Th
At DESY, developments towards the fourth-generation synchrotron light source PETRA IV are ongoing in...
Petra IV BPM System, Status and Development: Introduction, Tests at Petra 3, BPM System for PETRA IV...
- Introduction- Overview and Particularities of PETRA IV- Beam Position Monitors- Test Measurements ...
Within the PETRA IV project at DESY, thesynchrotron radiation source PETRA III will be upgradedinto ...
In the scope of the TDR phase for the future PETRA IV low-emittance ring upgrade project, special at...
PETRA IV at DESY will be an upgrade of the present synchrotron radiation source PETRA III into an ul...
There is a large range of bandwidth needed for the BPM electronic for the Petrapreaccelerators. The ...
For the new PETRA IV project at DESY, about 800 high resolution BPMs will be installed with the read...
In order to measure the noise level of a BPM system from beam generated orbit data, the correlated b...
For the planned upgrade of synchrotron radiation sources PETRA (called PETRA IV) at DESY a much high...
At DESY, an upgrade of the PETRA III synchrotron light source towards a fourth-generation, low emit-...
A series of Beam Position Monitors (BPMs) will be installed at the Front End Test Stand (FETS) at RA...
At DESY it is planned to convert the PETRA ring into a synchrotron radiation facility, called PETRA ...
Abstract The ESS Linac will include in total more than 140 Beam Position Monitors of different sizes...
Development of the beam diagnostics system for the J-PARC Rapid-Cycling Synchrotron is described. Th
At DESY, developments towards the fourth-generation synchrotron light source PETRA IV are ongoing in...