Methods for quantifying flood risk of civil infrastructure systems such as road and rail networks require considerably more information compared to traditional methods that focus on flood risk at a point. These systems are characterised by multiple interconnected components, whereby a ‘failure’ of the overall system can arise because of complex combinations of failures in system subcomponents. For example, flooding of a single bridge along a railway may leave the entire railway inoperable, and the interest is often in the probability that one or more bridges along a stretch of railway will be flooded, rather than designing each bridge in isolation. Similarly, the viability of evacuation routes often requires an assessment of the probability...
Masters Degree. University of KwaZulu-Natal, Pietermaritzburg.It has been reported that global clima...
Flood risk in estuarine regions can be difficult to estimate due to the relationship between extreme...
The design of flood defence structures requires the estimation of flood water levels corresponding t...
Widespread flooding, such as the events in the winter of 2013/2014 in the UK and early summer 2013 i...
Effective management of flooding requires models that are capable of quantifying flood risk. Quantif...
Flooding is known to be one of the worst natural disasters and can lead to significant economic dama...
Climate change is expected to result in more frequent occurrences of extreme flood events, such as ...
Recent studies have shown that flood risk contributes to a major part of the total risk caused by na...
This paper presents the case for an ‘End-to-End’ flood inundation modeling strategy: the creation of...
Design flood estimation remains a problem for many engineering hydrologists. Advice is required rega...
Design flood estimation techniques currently used in Australia only partially account for the joint ...
The design of urban stormwater infrastructure is generally performed assuming that climate is static...
This paper provides a proposed methodology for estimating flood risk in situations where the potenti...
Design flood estimation is often required in hydrologic practice. For catchments with sufficient str...
Design flood estimation remains a problem for many engineering hydrologists. Advice is required rega...
Masters Degree. University of KwaZulu-Natal, Pietermaritzburg.It has been reported that global clima...
Flood risk in estuarine regions can be difficult to estimate due to the relationship between extreme...
The design of flood defence structures requires the estimation of flood water levels corresponding t...
Widespread flooding, such as the events in the winter of 2013/2014 in the UK and early summer 2013 i...
Effective management of flooding requires models that are capable of quantifying flood risk. Quantif...
Flooding is known to be one of the worst natural disasters and can lead to significant economic dama...
Climate change is expected to result in more frequent occurrences of extreme flood events, such as ...
Recent studies have shown that flood risk contributes to a major part of the total risk caused by na...
This paper presents the case for an ‘End-to-End’ flood inundation modeling strategy: the creation of...
Design flood estimation remains a problem for many engineering hydrologists. Advice is required rega...
Design flood estimation techniques currently used in Australia only partially account for the joint ...
The design of urban stormwater infrastructure is generally performed assuming that climate is static...
This paper provides a proposed methodology for estimating flood risk in situations where the potenti...
Design flood estimation is often required in hydrologic practice. For catchments with sufficient str...
Design flood estimation remains a problem for many engineering hydrologists. Advice is required rega...
Masters Degree. University of KwaZulu-Natal, Pietermaritzburg.It has been reported that global clima...
Flood risk in estuarine regions can be difficult to estimate due to the relationship between extreme...
The design of flood defence structures requires the estimation of flood water levels corresponding t...