The development and implementation of the computer methods at project managing in the part of the planning of designing and installation of mechanical elements with the fit (assembly block) of the gear speed reducer is significant and at present irreplaceable engineering task if it has been realized by the modern parameter technology. There are multifunction uses of this organized group of activities, beginning from the quick changeability of elements still in the phase of designing and constructing, thanks to the characteristics of their associativity, still to the wide basis of standard elements that are incorporated in the very program package. Meanwhile, these activities are not simple, so their realization has to be planned from the st...