Oncor Electric Delivery Company, LLC is planning to construct the Balding POD 138-kV Transmission Line in Winkler County, Texas. Halff Associates, Inc, the routing consultant for Oncor, contracted with AR Consultants, Inc. to conduct an intensive pedestrian survey of the 370-m proposed transmission line route located on University of Texas School Lands. Survey was conducted on August 30, 2017. Four shovel tests were excavated and transects were walked within the 100-ft survey corridor (2.7 acres); no cultural resources were identified in these shovel tests nor on the surface. Due to prior disturbances, poor integrity of context, eroded and shallow soils, and the absence of any identified cultural materials in the study area, the proposed pr...
EnLink Midstream contracted with HDR Engineering, Inc. (HDR) to conduct an intensive cultural resour...
On February 3 of 2016, and on March 1 and 2 of 2017, archeologists from aci consulting conducted a p...
Lorena Tax Increment Reinvestment Zone (TIRZ) #1 East has proposed the TIRZ #1 East Phase 1 Trunk Li...
Oncor Electric Delivery Company, LLC (Oncor) is planning to construct the Owl Hills—Tunstill 138-kV ...
Oncor Electric Delivery Company LLC (Oncor) has contracted with HDR, Inc. (HDR) to conduct an intens...
Oncor Electric Delivery LLC (Oncor) contracted with HDR Engineering, Inc. (HDR) to conduct an intens...
At the request of American Electric Power, Blanton & Associates, Inc., conducted a non-collection ar...
The Texas and New Mexico Power Company (TNMP) is proposing to rebuild a 69 kV transmission line from...
On June 14-15, 2017, an intensive archeological survey was completed in order to evaluate potential ...
Terracon Consultants, Inc. (Terracon) was contracted by PNM Resources to conduct a Phase I archeolog...
SWCA Environmental Consultants (SWCA) conducted a cultural resources investigation on behalf of CPS ...
At the request of Salt Creek Midstream (SCM), Flatrock Engineering and Environmental, LLC (Flatrock)...
In August 1981, the Center for Archaeological Research, The University of Texas at San Antonio, cond...
During January 1986, the Center for Archaeological Research, The University of Texas at San Antonio ...
On 12 October 2017, Horizon Environmental Services, Inc. (Horizon) conducted an intensive cultural r...
EnLink Midstream contracted with HDR Engineering, Inc. (HDR) to conduct an intensive cultural resour...
On February 3 of 2016, and on March 1 and 2 of 2017, archeologists from aci consulting conducted a p...
Lorena Tax Increment Reinvestment Zone (TIRZ) #1 East has proposed the TIRZ #1 East Phase 1 Trunk Li...
Oncor Electric Delivery Company, LLC (Oncor) is planning to construct the Owl Hills—Tunstill 138-kV ...
Oncor Electric Delivery Company LLC (Oncor) has contracted with HDR, Inc. (HDR) to conduct an intens...
Oncor Electric Delivery LLC (Oncor) contracted with HDR Engineering, Inc. (HDR) to conduct an intens...
At the request of American Electric Power, Blanton & Associates, Inc., conducted a non-collection ar...
The Texas and New Mexico Power Company (TNMP) is proposing to rebuild a 69 kV transmission line from...
On June 14-15, 2017, an intensive archeological survey was completed in order to evaluate potential ...
Terracon Consultants, Inc. (Terracon) was contracted by PNM Resources to conduct a Phase I archeolog...
SWCA Environmental Consultants (SWCA) conducted a cultural resources investigation on behalf of CPS ...
At the request of Salt Creek Midstream (SCM), Flatrock Engineering and Environmental, LLC (Flatrock)...
In August 1981, the Center for Archaeological Research, The University of Texas at San Antonio, cond...
During January 1986, the Center for Archaeological Research, The University of Texas at San Antonio ...
On 12 October 2017, Horizon Environmental Services, Inc. (Horizon) conducted an intensive cultural r...
EnLink Midstream contracted with HDR Engineering, Inc. (HDR) to conduct an intensive cultural resour...
On February 3 of 2016, and on March 1 and 2 of 2017, archeologists from aci consulting conducted a p...
Lorena Tax Increment Reinvestment Zone (TIRZ) #1 East has proposed the TIRZ #1 East Phase 1 Trunk Li...