AECOM was contracted by the Upper Brushy Creek Water Control and Improvement District (UBCWCID) to conduct a cultural resources survey for the proposed Dam No. 101 project, located in Williamson County, Texas. AECOM evaluated a 189-acre area of potential effects (APE), which includes the conceptual dam footprint plus a 150-foot (ft) buffer, the inundation area, and any additional areas that could be potentially affected by key construction activities. The project is bisected by O’Conner Drive on the north side of State Highway 45 and partially overlaps the existing Dam No. 9. AECOM conducted an intensive cultural resources survey within the APE from September 16 – 20, 2019. The objectives of the survey were to inventory any archaeological a...