Reduced time and, by the same token, the cost of the project is a crucial factor in contemporary construction. This article presents a method for the exact optimisation of a resource-constrained scheduling problem. Based on the Critical Path Method, graph theory and linear programming, an algorithm was developed and the FROPT program was written in Matlab to minimise the execution time of the task. By using the newly-created program, sample networks were calculated and the results were compared with results obtained by using the MS Project scheduling program (using approximation algorithm). The execution time obtained by using FROPT were on average 10% shorter than those obtained using MS Project. In selected cases the improvement in execut...
Effective project management implies the use of advanced planning and scheduling methods that allow ...
The absence of a valid resource-constrained critical path method (CPM) not only hampers the widespre...
The paper presents resource allocation optimization in Critical Chain Project Management (CCPM). The...
Reduced time and, by the same token, the cost of the project is a crucial factor in contemporary con...
The resource constrained project-scheduling problem (RCPSP) aims to minimize the duration of a proje...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
The paper presents the resource–constrained project-scheduling problem with the single execution mod...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
Abstract: Resource-constrained project scheduling involves the scheduling of project activities subj...
The report gives an overview of resource-constrained project scheduling with time windows. First it ...
Despite the importance of resource optimization in construction scheduling, very little success has ...
The paper concerns the problem of roadworks scheduling executed in the flow-shop system. Works may b...
Project scheduling problem with resources constraint is a well-known problem in the field of project...
A proper use of the resources has become the prime target of the economy circles nowadays. In this c...
Resource scheduling has been a major concern for decades in construction projects. However, most of ...
Effective project management implies the use of advanced planning and scheduling methods that allow ...
The absence of a valid resource-constrained critical path method (CPM) not only hampers the widespre...
The paper presents resource allocation optimization in Critical Chain Project Management (CCPM). The...
Reduced time and, by the same token, the cost of the project is a crucial factor in contemporary con...
The resource constrained project-scheduling problem (RCPSP) aims to minimize the duration of a proje...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
The paper presents the resource–constrained project-scheduling problem with the single execution mod...
Construction projects is high-rise buildings, highways,power stations, pipelines etc are involving t...
Abstract: Resource-constrained project scheduling involves the scheduling of project activities subj...
The report gives an overview of resource-constrained project scheduling with time windows. First it ...
Despite the importance of resource optimization in construction scheduling, very little success has ...
The paper concerns the problem of roadworks scheduling executed in the flow-shop system. Works may b...
Project scheduling problem with resources constraint is a well-known problem in the field of project...
A proper use of the resources has become the prime target of the economy circles nowadays. In this c...
Resource scheduling has been a major concern for decades in construction projects. However, most of ...
Effective project management implies the use of advanced planning and scheduling methods that allow ...
The absence of a valid resource-constrained critical path method (CPM) not only hampers the widespre...
The paper presents resource allocation optimization in Critical Chain Project Management (CCPM). The...