The Chinese Basic Quality (BQ) system was used to determine the rock mass classes and design tunnel support system of the Tunnel No.8 of the Jakarta-Bandung high-speed railway. As the BQ system is newly applied for tunnelling project in Indonesia and remains poorly understood, this research aims to determine rock mass classes at the tunnel construction site and propose the tunnel excavation method and support system alternative based on more widely used rock mass classifications of the Geological Strength Index (GSI) and Japan Society of Civil Engineers (JSCE) standard. Surface engineering geological mapping and evaluation of drill core samples were carried out to obtain accurate interpretation of subsurface engineering geological condition...
The paper analyses the geological conditions of study area, rock mass strength parameters with suita...
Various geological and geotechnical conditions at different project sites require different design, ...
To meet the huge demands of transportation, energy and other infrastructure projects, a large volume...
The empirical design of tunnel 7 of the Jakarta-Bandung high-speed railway was based on the Basic Qu...
An engineering geological mapping was carried out at the construction site of the Tunnel 10 of Jakar...
This paper presents the investigation of surface geology and subsurface engineering geology to analy...
Research on the classification of rock mass quality in the intake tunnel Jlantah dam has not been ca...
The tunnel excavation plan is proposed to solve the transportation problem in Piyungan-Patuk area, w...
This paper presents engineering geological investigation results in the form of rock mass characteri...
This paper presents experiences with design and construction process of the Tanju Tunnel, West Nusa ...
This paper presents the results of a geological engineering investigation in the form of rock mass c...
This research has examined the rock mass quality case study in the Tiga Dihaji Dam’s diversion tunne...
Tunnel 3 of the Sigli Banda Aceh Toll Road has been designed based on several site investigations. T...
The primary output of the rock mass rating (RMR) and tunneling quality index (Q) system is a prelimi...
This paper presents the results of engineering geological studies of the rock masses along a road tu...
The paper analyses the geological conditions of study area, rock mass strength parameters with suita...
Various geological and geotechnical conditions at different project sites require different design, ...
To meet the huge demands of transportation, energy and other infrastructure projects, a large volume...
The empirical design of tunnel 7 of the Jakarta-Bandung high-speed railway was based on the Basic Qu...
An engineering geological mapping was carried out at the construction site of the Tunnel 10 of Jakar...
This paper presents the investigation of surface geology and subsurface engineering geology to analy...
Research on the classification of rock mass quality in the intake tunnel Jlantah dam has not been ca...
The tunnel excavation plan is proposed to solve the transportation problem in Piyungan-Patuk area, w...
This paper presents engineering geological investigation results in the form of rock mass characteri...
This paper presents experiences with design and construction process of the Tanju Tunnel, West Nusa ...
This paper presents the results of a geological engineering investigation in the form of rock mass c...
This research has examined the rock mass quality case study in the Tiga Dihaji Dam’s diversion tunne...
Tunnel 3 of the Sigli Banda Aceh Toll Road has been designed based on several site investigations. T...
The primary output of the rock mass rating (RMR) and tunneling quality index (Q) system is a prelimi...
This paper presents the results of engineering geological studies of the rock masses along a road tu...
The paper analyses the geological conditions of study area, rock mass strength parameters with suita...
Various geological and geotechnical conditions at different project sites require different design, ...
To meet the huge demands of transportation, energy and other infrastructure projects, a large volume...