In this paper, a new high speed control circuit is proposed which will act as a critical path for the data which will go from input to output to improve the performance of wave pipelining circuits The wave pipelining is a method of high performance circuit designs which implements pipelining in logic without the use of intermediate registers. Wave pipelining has been widely used in the past few years with a great deal of significant features in technology and applications. It has the ability to improve speed, efficiency, economy in every aspect which it presents. Wave pipelining is being used in wide range of applications like digital filters, network routers, multipliers, fast convolvers, MODEMs, image processing, control systems, radars a...
Aggressive design using level-sensitive latches and wave pipelining has been proposed to meet the in...
High performance digital systems make extensive use of pipelines. Three years ago, "surfing" pipeli...
609-613Pipeline system requires clock routine complexity and clock skews between different parts of...
High throughput and low latency designs are required in modern high performance systems, especially ...
Includes bibliographic references (leaves 39-41)Thesis (M.S.)--Wichita State University, Dept. of El...
Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses...
In conventional pipelined designs one set of signals is allowed to propagate between sets of flipflo...
The use of level-sensitive latches and wave-pipelining techniques are two aggressive methods to incr...
Wave pipelining is a design technique for increasing the throughput of a digital circuit or system w...
Pipelining of data path structures increases the throughput rate at the expense of enlarged resource...
The Gigahertz clock rates in today's VLSI systems are not only due to advances in technology but tha...
Pipeline architectures are often considered in VLSI designs that require high throughput. The draw-b...
In all of the previous pipelining methods such as conventional pipelining, wave pipelining, and meso...
The minimization of propagation delay between pipeline stages is very important in wave propagation ...
Scope and Method of Study: Wave pipeline is one of the revolutionary technologies beyond conventiona...
Aggressive design using level-sensitive latches and wave pipelining has been proposed to meet the in...
High performance digital systems make extensive use of pipelines. Three years ago, "surfing" pipeli...
609-613Pipeline system requires clock routine complexity and clock skews between different parts of...
High throughput and low latency designs are required in modern high performance systems, especially ...
Includes bibliographic references (leaves 39-41)Thesis (M.S.)--Wichita State University, Dept. of El...
Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses...
In conventional pipelined designs one set of signals is allowed to propagate between sets of flipflo...
The use of level-sensitive latches and wave-pipelining techniques are two aggressive methods to incr...
Wave pipelining is a design technique for increasing the throughput of a digital circuit or system w...
Pipelining of data path structures increases the throughput rate at the expense of enlarged resource...
The Gigahertz clock rates in today's VLSI systems are not only due to advances in technology but tha...
Pipeline architectures are often considered in VLSI designs that require high throughput. The draw-b...
In all of the previous pipelining methods such as conventional pipelining, wave pipelining, and meso...
The minimization of propagation delay between pipeline stages is very important in wave propagation ...
Scope and Method of Study: Wave pipeline is one of the revolutionary technologies beyond conventiona...
Aggressive design using level-sensitive latches and wave pipelining has been proposed to meet the in...
High performance digital systems make extensive use of pipelines. Three years ago, "surfing" pipeli...
609-613Pipeline system requires clock routine complexity and clock skews between different parts of...