The purpose of this study is to apply the CPM (Critical Path Method) method to predict and optimize the project's total duration on the scheduling of house construction projects by PT Ghani Sejahtera Abadi. In this research, the method used is quantitative with a descriptive approach. The subjects of this research are project owners and workers who build houses in Kedungrandu Regency Housing. Sources of data needed to meet the criteria for data that CPM can analyze include: (a) data on the name of the activities in the project, (b) the sequence of activities on the project, and (c) data at the time used in the house construction project. For data collection in this study using several techniques, namely interviews and literature study. Base...
Ketepatan biaya dan waktu sangat mempengaruhi keberhasilan penyelenggaraan proyek, tidak terkecuali ...
The success or failure of project implementation is often caused by the lack of planned project acti...
Penjadwalan proyek merupakan bagian yang paling penting dari sebuah perencanaan proyek, yaitu untuk ...
The efficiency of project implementation time becomes one of the efforts in optimizing the use of im...
This research was conducted at CV. Karya Guna Pasuruan. A company engaged in contractor and propert...
Project implementation often occurs delays from the initial plan when the project plan is completed ...
In the current era, the development of construction really needs to be done by implementing quality ...
CV Basuki Rahmat Prabumulih is a company that has the scope of services development (developer), inc...
The process of planning and project control during the execution of the construction project work is...
A project will have a time limit (deadline) of any activity that takes place, which means that the p...
Planning a project there are many important things that affect the success and smoothness, one of wh...
Muhammad Rhino Rakadhipa, 2017. Analysis Network Work With Critical Path Methode (CPM) Development o...
The development of housing development in Indonesia is now showing a very rapid progress in line wit...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
Basically a project is a one-time activity, with limited time and resources to achieve the final res...
Ketepatan biaya dan waktu sangat mempengaruhi keberhasilan penyelenggaraan proyek, tidak terkecuali ...
The success or failure of project implementation is often caused by the lack of planned project acti...
Penjadwalan proyek merupakan bagian yang paling penting dari sebuah perencanaan proyek, yaitu untuk ...
The efficiency of project implementation time becomes one of the efforts in optimizing the use of im...
This research was conducted at CV. Karya Guna Pasuruan. A company engaged in contractor and propert...
Project implementation often occurs delays from the initial plan when the project plan is completed ...
In the current era, the development of construction really needs to be done by implementing quality ...
CV Basuki Rahmat Prabumulih is a company that has the scope of services development (developer), inc...
The process of planning and project control during the execution of the construction project work is...
A project will have a time limit (deadline) of any activity that takes place, which means that the p...
Planning a project there are many important things that affect the success and smoothness, one of wh...
Muhammad Rhino Rakadhipa, 2017. Analysis Network Work With Critical Path Methode (CPM) Development o...
The development of housing development in Indonesia is now showing a very rapid progress in line wit...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
Basically a project is a one-time activity, with limited time and resources to achieve the final res...
Ketepatan biaya dan waktu sangat mempengaruhi keberhasilan penyelenggaraan proyek, tidak terkecuali ...
The success or failure of project implementation is often caused by the lack of planned project acti...
Penjadwalan proyek merupakan bagian yang paling penting dari sebuah perencanaan proyek, yaitu untuk ...