In this paper, a project scheduling problem with multi-modes and a single non-renewable resource is considered. The resource is released in pre-specified times at pre-specified quantities. An activity can be executed at different modes where a mode is defined by a processing time and a resource requirement amount. The objective is to minimize the project completion time. A branch and bound algorithm that enumerates the partial solutions based on the mode assignment decisions is presented. The results of the experiments have revealed that the branch and bound algorithm can solve problem instances with up to 100 activities in reasonable times
In many solution methods for resource-constrained project scheduling, it is assumed that both the du...
this paper we consider nonpreemptive project scheduling models with mode identity and partially rene...
International audienceThis work introduces a procedure to solve the multi-skill project scheduling p...
In this thesis, we consider a multi-mode project scheduling problem with a single nonrenewable resou...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In this study, we consider a multi-mode resource allocation problem with a single non-renewable reso...
This chapter reports on a new solution approach for the multi-mode resource-constrained project sche...
We study scheduling problems with multiple modes and dedicated resources arising in production and p...
Renewable and non-renewable resource constraints have been vast studied in theoretical fields of pro...
This paper reports on a new solution approach for the well-known multi-mode resource-constrained pro...
In this paper a branch-and-bound procedure is described for scheduling the activities of a project o...
We consider the resource-constrained project scheduling problem. The purpose of this paper is to dir...
We consider a generalization of the classical resource constrained project scheduling problem. We in...
This paper reports on a new solution approach for the well-known multi-mode resource-constrained pro...
In many solution methods for resource-constrained project scheduling, it is assumed that both the du...
this paper we consider nonpreemptive project scheduling models with mode identity and partially rene...
International audienceThis work introduces a procedure to solve the multi-skill project scheduling p...
In this thesis, we consider a multi-mode project scheduling problem with a single nonrenewable resou...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In this study, we consider a multi-mode resource allocation problem with a single non-renewable reso...
This chapter reports on a new solution approach for the multi-mode resource-constrained project sche...
We study scheduling problems with multiple modes and dedicated resources arising in production and p...
Renewable and non-renewable resource constraints have been vast studied in theoretical fields of pro...
This paper reports on a new solution approach for the well-known multi-mode resource-constrained pro...
In this paper a branch-and-bound procedure is described for scheduling the activities of a project o...
We consider the resource-constrained project scheduling problem. The purpose of this paper is to dir...
We consider a generalization of the classical resource constrained project scheduling problem. We in...
This paper reports on a new solution approach for the well-known multi-mode resource-constrained pro...
In many solution methods for resource-constrained project scheduling, it is assumed that both the du...
this paper we consider nonpreemptive project scheduling models with mode identity and partially rene...
International audienceThis work introduces a procedure to solve the multi-skill project scheduling p...