Hydraulic model tests of the spillway of Yukar Kalekoy Dam and Hydroelectric Power Plant (HPP) were carried out at Hydromechanics Laboratory of Middle East Technical University (METU), Ankara. In order to investigate the flow conditions in the approach channel, over the weir structure, around the spillway piers, along the spillway chute channels and after the flip buckets, and also to observe the performance of the aeration devices, a model of 1/70 length scale was constructed. The model area covers an about 400 m x 450 m section of the Yukar Kalekoy reservoir, the whole spillway structure and a part of the river area of about 150 m x 200 m downstream of the flip buckets. Experiments were carried out at various discharges; QPMF, Q(1000) and...
The Karahnjukar dam spillway is the spillway for the Halslon reservoir, the main reservoir for the 6...
In the past few decades, spillways have attraction significant as flow measuring devices as well as ...
The hydraulic design of spillways, with high specific discharge usually requires model investigation...
AbstractHydraulic model tests of the spillway of Yukarı Kaleköy Dam and Hydroelectric Power Plant (H...
AbstractHydraulic model tests of the spillway of Yukarı Kaleköy Dam and Hydroelectric Power Plant (H...
Shahryar dam is currently under construction on the Qezel Owzan River (East Azerbaijan Province) in ...
A model of the spillway for the Nader Shah Projeot, a key element of the Marun River Development un...
AbstractHydraulic model tests of the intake structure of Beyhan 1 Dam having four units were carried...
The entrance conditions, flow around the piers and the pressure distributions along the centerline a...
Piano Key Weirs (PKW) are useful overflow structures to increase discharge capacity per unit length ...
Hydropower plants with spillways exposed to high pressures because of large discharges can result in...
The spillway of Sarpfossen hydropower plant has been studied numerically and experimentally. The phy...
V hydrotechnické laboratoři byl vybudován fyzikální model pravého šachtového přelivu VD Les Královst...
The Karahnjukar dam spillway is the spillway for the Halslon reservoir, the main reservoir for the 6...
Hydropower plants with spillways exposed to high pressures because of large discharges can result in...
The Karahnjukar dam spillway is the spillway for the Halslon reservoir, the main reservoir for the 6...
In the past few decades, spillways have attraction significant as flow measuring devices as well as ...
The hydraulic design of spillways, with high specific discharge usually requires model investigation...
AbstractHydraulic model tests of the spillway of Yukarı Kaleköy Dam and Hydroelectric Power Plant (H...
AbstractHydraulic model tests of the spillway of Yukarı Kaleköy Dam and Hydroelectric Power Plant (H...
Shahryar dam is currently under construction on the Qezel Owzan River (East Azerbaijan Province) in ...
A model of the spillway for the Nader Shah Projeot, a key element of the Marun River Development un...
AbstractHydraulic model tests of the intake structure of Beyhan 1 Dam having four units were carried...
The entrance conditions, flow around the piers and the pressure distributions along the centerline a...
Piano Key Weirs (PKW) are useful overflow structures to increase discharge capacity per unit length ...
Hydropower plants with spillways exposed to high pressures because of large discharges can result in...
The spillway of Sarpfossen hydropower plant has been studied numerically and experimentally. The phy...
V hydrotechnické laboratoři byl vybudován fyzikální model pravého šachtového přelivu VD Les Královst...
The Karahnjukar dam spillway is the spillway for the Halslon reservoir, the main reservoir for the 6...
Hydropower plants with spillways exposed to high pressures because of large discharges can result in...
The Karahnjukar dam spillway is the spillway for the Halslon reservoir, the main reservoir for the 6...
In the past few decades, spillways have attraction significant as flow measuring devices as well as ...
The hydraulic design of spillways, with high specific discharge usually requires model investigation...