In project scheduling, the activity durations can often be reduced by dedicating additional resources. Time/Cost Trade-off Problem considers the compromise between the total cost and project duration. The discrete version of the problem assumes a number of time/cost pairs, so called modes, and selects a mode for each activity. In this thesis we consider the Discrete Time/Cost Trade-off Problem. We first study the Deadline Problem, i.e., the problem of minimizing total cost subject to a deadline on project duration. To solve the Deadline Problem, we propose several optimization and approximation algorithms that are based on optimal Linear Programming Relaxation solutions. We then analyze the problem of generating all efficient solutions, and...
The time cost trade-off problem is a type of project scheduling problem which studies how to transfo...
In construction projects, activity durations can be expedited by allocating additional resources. De...
In this thesis, we consider a multi-mode project scheduling problem with a single nonrenewable resou...
In project management, the activity durations can often be reduced by dedicating additional resource...
The time/cost trade-off models in project management aim to compress the project completion time by ...
The discrete time/cost trade-off problem assumes the duration of project activities to be discrete, ...
Cataloged from PDF version of article.This paper investigates the budget variant of the discrete tim...
Due to its obvious practical relevance, the Time-Cost Tradeoff Problem has attracted the attention o...
Due to its obvious practical relevance, the Time-Cost Tradeoff Problem has achieved the attention of...
Due to copyright restrictions, the access to the full text of this article is only available via sub...
In managing a project, there is often the option of applying additional funds to reduce the processi...
There is a reverse relationship between the activity durations and costs in construction projects. I...
Resource-constrained project scheduling in a multi-project environment is a challenging optimization...
Time/cost trade-offs in project networks have been the subject of extensive research since the devel...
The discrete time/cost trade-off problem under various assumptions Exact and heuristic procedures Ti...
The time cost trade-off problem is a type of project scheduling problem which studies how to transfo...
In construction projects, activity durations can be expedited by allocating additional resources. De...
In this thesis, we consider a multi-mode project scheduling problem with a single nonrenewable resou...
In project management, the activity durations can often be reduced by dedicating additional resource...
The time/cost trade-off models in project management aim to compress the project completion time by ...
The discrete time/cost trade-off problem assumes the duration of project activities to be discrete, ...
Cataloged from PDF version of article.This paper investigates the budget variant of the discrete tim...
Due to its obvious practical relevance, the Time-Cost Tradeoff Problem has attracted the attention o...
Due to its obvious practical relevance, the Time-Cost Tradeoff Problem has achieved the attention of...
Due to copyright restrictions, the access to the full text of this article is only available via sub...
In managing a project, there is often the option of applying additional funds to reduce the processi...
There is a reverse relationship between the activity durations and costs in construction projects. I...
Resource-constrained project scheduling in a multi-project environment is a challenging optimization...
Time/cost trade-offs in project networks have been the subject of extensive research since the devel...
The discrete time/cost trade-off problem under various assumptions Exact and heuristic procedures Ti...
The time cost trade-off problem is a type of project scheduling problem which studies how to transfo...
In construction projects, activity durations can be expedited by allocating additional resources. De...
In this thesis, we consider a multi-mode project scheduling problem with a single nonrenewable resou...