In this paper, we study a resource-constrained project-scheduling problem in which the objective is minimizing total Resource Tardiness Penalty Costs. We assume renewable resources that are limited in number, are restricted to very expensive equipment and machines, therefore they are rented and used in other projects, and are not available in all project periods. In other words, there exists a predefined ready-date as well as a due date for each renewable resource type. In this way, no resource is utilized before its ready date. Nevertheless, resources are allowed to be used after their due date by paying penalty costs depending on the resource type. The objective is to minimize the costs of renewable resource usages. We formulated and math...
In this paper, we discuss the resource-constrained project scheduling problem with discounted cash f...
This paper considers a preemptive multi-skilled resource constrained project scheduling problem in a...
Existing research has focused on solving problems in the area of project management using variety of...
International audienceThis paper is concerned with an overview of the Resource-Constrained Project S...
In this paper, we consider scheduling of project networks under minimization of total weighted resou...
Abstract — In this article, an Artificial Immune Algorithm (AIA) for minimizing total costs of both ...
We consider a generalization of the classical resource constrained project scheduling problem. We in...
This thesis deals with the description of the state of resource-constrained project scheduling probl...
In this thesis, meta-heuristic algorithms are developed to obtain optimum or near optimum solutions ...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
This study developed a mathematical model to optimize multi-mode resource-constrained project schedu...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
A Resource Investment Problem is a project scheduling problem recently considered. In this issue, in...
Abstract We consider a novel generalization of the resource-constrained project scheduling problem (...
In this paper, we discuss the resource-constrained project scheduling problem with discounted cash f...
This paper considers a preemptive multi-skilled resource constrained project scheduling problem in a...
Existing research has focused on solving problems in the area of project management using variety of...
International audienceThis paper is concerned with an overview of the Resource-Constrained Project S...
In this paper, we consider scheduling of project networks under minimization of total weighted resou...
Abstract — In this article, an Artificial Immune Algorithm (AIA) for minimizing total costs of both ...
We consider a generalization of the classical resource constrained project scheduling problem. We in...
This thesis deals with the description of the state of resource-constrained project scheduling probl...
In this thesis, meta-heuristic algorithms are developed to obtain optimum or near optimum solutions ...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
This study developed a mathematical model to optimize multi-mode resource-constrained project schedu...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
A Resource Investment Problem is a project scheduling problem recently considered. In this issue, in...
Abstract We consider a novel generalization of the resource-constrained project scheduling problem (...
In this paper, we discuss the resource-constrained project scheduling problem with discounted cash f...
This paper considers a preemptive multi-skilled resource constrained project scheduling problem in a...
Existing research has focused on solving problems in the area of project management using variety of...