The Front-End Link eXchange (FELIX) system is an interface between the trigger and detector electronics and commodity switched networks for the ATLAS experiment at CERN. In preparation for the LHC Run 3, to start in 2022, the system is being installed to read out the new electromagnetic calorimeter, calorimeter trigger, and muon components being installed as part of the ongoing ATLAS upgrade programme. The detector and trigger electronic systems are largely custom and fully synchronous with respect to the 40.08 MHz clock of the Large Hadron Collider (LHC). The FELIX system uses FPGAs on server-hosted PCIe boards to pass data between custom data links connected to the detector and trigger electronics and host system memory over a PCIe interf...
After the Phase-I upgrades (2019) of the ATLAS experiment, the Front-End Link eXchange (FELIX) syste...
During the current major LHC shutdown (2019-2021), the ATLAS experiment at CERN is moving to the Fro...
After the Phase-I upgrade and onward, the Front-End Link eXchange (FELIX) system will be the interfa...
The Front-End Link eXchange (FELIX) system is an interface between the trigger and detector electron...
During the next major shutdown from 2019-2020, the ATLAS experiment at the LHC at CERN will adopt th...
After the current LHC shutdown (2019-2021), the ATLAS experiment will be required to operate in an i...
After the current LHC shutdown (2019-2021), the ATLAS experiment at the LHC at CERN will be required...
Starting during the upcoming major LHC shutdown from 2019-2021, the ATLAS experiment at CERN will mo...
The ATLAS experiment at the LHC at CERN will move to use the Front-End Link eXchange (FELIX) system ...
During the next major shutdown (2019-2020), the ATLAS experiment at the LHC will adopt the Front-End...
After the current LHC shutdown (2019-2021), the ATLAS experiment at the LHC at CERN will be required...
The ATLAS experiment at the LHC at CERN will move to use the Front-End Link eXchange (FELIX) system ...
Over the next decade, the ATLAS detector will be required to operate in an increasingly harsh collis...
During the next major shutdown from 2019-2020, the ATLAS experiment at the LHC at CERN will adopt th...
The High Luminosity LHC will start to operate from LHC Run 4 2029, and will see the ATLAS experiment...
After the Phase-I upgrades (2019) of the ATLAS experiment, the Front-End Link eXchange (FELIX) syste...
During the current major LHC shutdown (2019-2021), the ATLAS experiment at CERN is moving to the Fro...
After the Phase-I upgrade and onward, the Front-End Link eXchange (FELIX) system will be the interfa...
The Front-End Link eXchange (FELIX) system is an interface between the trigger and detector electron...
During the next major shutdown from 2019-2020, the ATLAS experiment at the LHC at CERN will adopt th...
After the current LHC shutdown (2019-2021), the ATLAS experiment will be required to operate in an i...
After the current LHC shutdown (2019-2021), the ATLAS experiment at the LHC at CERN will be required...
Starting during the upcoming major LHC shutdown from 2019-2021, the ATLAS experiment at CERN will mo...
The ATLAS experiment at the LHC at CERN will move to use the Front-End Link eXchange (FELIX) system ...
During the next major shutdown (2019-2020), the ATLAS experiment at the LHC will adopt the Front-End...
After the current LHC shutdown (2019-2021), the ATLAS experiment at the LHC at CERN will be required...
The ATLAS experiment at the LHC at CERN will move to use the Front-End Link eXchange (FELIX) system ...
Over the next decade, the ATLAS detector will be required to operate in an increasingly harsh collis...
During the next major shutdown from 2019-2020, the ATLAS experiment at the LHC at CERN will adopt th...
The High Luminosity LHC will start to operate from LHC Run 4 2029, and will see the ATLAS experiment...
After the Phase-I upgrades (2019) of the ATLAS experiment, the Front-End Link eXchange (FELIX) syste...
During the current major LHC shutdown (2019-2021), the ATLAS experiment at CERN is moving to the Fro...
After the Phase-I upgrade and onward, the Front-End Link eXchange (FELIX) system will be the interfa...