In this paper, a fuzzy critical path problem is chosen to show that the results, obtained by using the existing method [Liu, S.T.: Fuzzy activity times in critical path and project crashing problems. Cybernetics and Systems 34 (2), 161-172 (2003)], could be improved to reflect, more appropriate real life situations. To obtain more accurate results of fuzzy critical path problems, a new method that modifies the existing one is proposed here. To demonstrate the advantages of the proposed method it is used to solve a specific fuzzy critical path problem
Critical Path Method (CPM), which is used to schedule construction activitiesdepending to each other...
This research paper proposes a modified ranking approach to determine the critical path in fuzzy pro...
This paper focuses on the identification of the critical path in complex projects networks. To exten...
A new method for finding fuzzy optimal solution, the maximum total completion fuzzy time and fuzzy c...
The method for finding fuzzy optimal solution of fully fuzzy critical path (FFCP) problems i.e., cri...
In this paper, we propose a new approach to Fuzzy network crashing in a project network whose activi...
The Critical Path Method (CPM) is useful for planning and control of complex projects. The CPM ident...
The Critical Path Method (CPM) is useful for planning and control of complex projects. The CPM ident...
In this paper, we analyze the project scheduling problem using fuzzy theory. The crisp activity dura...
A project network consists of various activities. To determine the length of project time and the am...
There are several fuzzy critical path methods for solving fuzzy critical path problems in which rank...
INDONESIA: Critical Path Method (CPM) adalah salah satu alat perencanaan dan pengontrolan pada pr...
AbstractTriangular fuzzy numbers are used to represent project activities whose duration times are u...
INDONESIA : Perkembangan ilmu mengenai Critical Path Method tidak hanya dalam matematika saja, na...
In this paper, fuzzy critical path analysis of a project network is carried out. Metric distance ran...
Critical Path Method (CPM), which is used to schedule construction activitiesdepending to each other...
This research paper proposes a modified ranking approach to determine the critical path in fuzzy pro...
This paper focuses on the identification of the critical path in complex projects networks. To exten...
A new method for finding fuzzy optimal solution, the maximum total completion fuzzy time and fuzzy c...
The method for finding fuzzy optimal solution of fully fuzzy critical path (FFCP) problems i.e., cri...
In this paper, we propose a new approach to Fuzzy network crashing in a project network whose activi...
The Critical Path Method (CPM) is useful for planning and control of complex projects. The CPM ident...
The Critical Path Method (CPM) is useful for planning and control of complex projects. The CPM ident...
In this paper, we analyze the project scheduling problem using fuzzy theory. The crisp activity dura...
A project network consists of various activities. To determine the length of project time and the am...
There are several fuzzy critical path methods for solving fuzzy critical path problems in which rank...
INDONESIA: Critical Path Method (CPM) adalah salah satu alat perencanaan dan pengontrolan pada pr...
AbstractTriangular fuzzy numbers are used to represent project activities whose duration times are u...
INDONESIA : Perkembangan ilmu mengenai Critical Path Method tidak hanya dalam matematika saja, na...
In this paper, fuzzy critical path analysis of a project network is carried out. Metric distance ran...
Critical Path Method (CPM), which is used to schedule construction activitiesdepending to each other...
This research paper proposes a modified ranking approach to determine the critical path in fuzzy pro...
This paper focuses on the identification of the critical path in complex projects networks. To exten...