The bachelor thesis focuses on static analysis of the steel footbridge, inspired by real footbridge over the Morava river. Bridge was designed as a solid ribbed arch, so it consists of a pair truss beams, reinforced by two steel arches with suspenders. A similar model is created the SCIA Engineer program. The total length of the footbridge is 137,5 m in projection and the highest point of bridge is 9,13 m. This bachelor thesis is processed according to valid standards. The structural load is calculated manually. Furthermore, some known methods are used to calculate statically indeterminate structures to find internal forces. For these calculations, is used a simplified bar model standing on four point supports. Afterwards, the results are c...